504 transportation project(s)
|
|
|
1601147 |
R-39625
|
Burns Harbor |
Multi-use Trail Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$809,176 |
CMAQ Chicago UZA |
2101110 |
R-43999
|
Cedar Lake |
Complete Streets sidewalks on 133rd and Morris |
Bike/Ped
|
$2,326,625 |
CMAQ Chicago UZA STBG Chicago UZA TAP Chicago UZA |
2301117 |
|
Cedar Lake |
133rd Avenue Road Raise-Flood Reduction Project |
Road Recons/Rehab/Resurf
|
$837,509 |
STBG Chicago UZA |
2300654 |
|
Cedar Lake |
Founders Creek Multi-Use Trail-FUTURE PROJECT |
Bike/Ped
|
$1,882,723 |
STBG Chicago UZA |
1902832 |
R-42649
|
Chesterton |
Multi-use paths / Westchester-Liberty Phase 3 |
Other
|
$1,592,000 |
CRP Chicago UZA TAP Chicago UZA |
2101117 |
|
Chesterton |
Installation of EVP devises on traffic signals |
Signal
|
$2,167,476 |
HSIP Chicago UZA |
1901948 |
R-43177
|
Crown Point |
Intersection Improvement-Roundabout US 231 & 113th |
Intersection
|
$2,514,810 |
STBG Chicago UZA |
2400093 |
|
DNR |
Wilson Rd over Dunes Creek - Dunes State Park |
Bridge
|
$2,300,000 |
Local Bridge |
2300655 |
|
Dyer |
Pennsy-Dyer Trail |
Bike/Ped
|
$3,090,126 |
TAP Chicago UZA |
NIR-25-002 |
|
E C Transit |
Maintain Existing Route Service |
Transit
|
$884,060 |
FTA 5307 Chicago UZA |
NIR-24-002 |
|
E C Transit |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
NIR-24-003 |
|
E C Transit |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$250,000 |
FTA 5307 Chicago UZA |
NIR-24-001 |
|
E C Transit |
Transit/Operating / 2024 Comp Paratransit |
Transit
|
$378,164 |
FTA 5307 Chicago UZA |
NIR-25-001 |
|
E C Transit |
Complementary paratransit service |
Transit
|
$738,858 |
FTA 5307 Chicago UZA |
NIR-25-003 |
|
E C Transit |
Transit Asset Management/2025-2026 Preventative Maintenance |
Transit
|
$500,000 |
FTA 5307 Chicago UZA |
2301104 |
|
East Chicago |
East Chicago Clean Fuel Equipment (2025) |
Other
|
$815,510 |
CMAQ Chicago UZA |
1601146 |
R-39624
|
East Chicago |
Multi-use Trails Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$1,584,800 |
CMAQ Chicago UZA |
2301105 |
|
East Chicago |
East Chicago Electric Vehicles |
Other
|
$450,000 |
CRP Chicago UZA |
2300726 |
R-45020
|
East Chicago |
Michigan Avenue from Sheridan Place to Broadway Street-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$3,138,996 |
STBG Chicago UZA |
2101118 |
R-44001
|
East Chicago |
Michigan Ave Reconstruction |
Road Recons/Rehab/Resurf
|
$5,030,258 |
STBG Chicago UZA |
1902830 |
|
Gary |
Signal Modernization 5th Ave & Bigger St. |
Signal
|
$498,256 |
HSIP Chicago UZA |
1802973 |
|
Gary |
Roadway Improvement Program / Road Reconstruction (3R/4R Standards) at 15th Ave |
Road Recons/Rehab/Resurf
|
$4,478,000 |
STBG Chicago UZA |
1802975 |
R-42184
|
Gary |
Road Rehabilitation (3R/4R) Airport Rd Phase IV |
Road Recons/Rehab/Resurf
|
$896,000 |
STBG Chicago UZA |
2300662 |
|
Gary |
Airport Road Relocation Project |
Road Recons/Rehab/Resurf
|
$600,000 |
STBG Chicago UZA |
NIRPC2600420 |
|
Gary |
5th Ave On Road Trail |
Road
|
$0 |
|
NIR-25-013 |
|
GPTC |
Transit Expansion - Hobart Yrs 1-3 |
Transit
|
$2,812,500 |
CMAQ Chicago UZA |
NIRPC2700657 |
|
GPTC |
Microtransit in Westlake or Hobart Areas |
Transit
|
$2,626,875 |
CMAQ Chicago UZA |
NIR-24-005 |
|
GPTC |
Transit/Operating / 2024 Comp Paratransit |
Transit
|
$973,925 |
FTA 5307 Chicago UZA |
NIR-25-007 |
|
GPTC |
Transit Planning |
Transit
|
$200,000 |
FTA 5307 Chicago UZA |
NIR-24-006 |
|
GPTC |
Transit/Operating / 2024 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIR-24-009 |
|
GPTC |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
NIRPC2700637 |
|
GPTC |
Preventive Maintenance |
Transit
|
$8,354,510 |
FTA 5307 Chicago UZA |
NIR-24-004 |
|
GPTC |
Transit/Customer Exp. / 2024 Trans. Facilities |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIRPC2700645 |
|
GPTC |
ADA |
Transit
|
$2,376,312 |
FTA 5307 Chicago UZA |
NIR-24-007 |
|
GPTC |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$1,552,558 |
FTA 5307 Chicago UZA |
NIR-25-011 |
|
GPTC |
simulator for driver training |
Transit
|
$370,000 |
FTA 5307 Chicago UZA |
NIRPC2700649 |
|
GPTC |
Planning |
Other
|
$250,000 |
FTA 5307 Chicago UZA |
NIR-25-005 |
|
GPTC |
Operating Assistance |
Transit
|
$2,994,103 |
FTA 5307 Chicago UZA |
NIRPC2700538 |
|
GPTC |
vehicle replacement |
Transit
|
$105,000 |
FTA 5307 Chicago UZA |
NIR-24-008 |
|
GPTC |
Planning / 2024 Planning |
Transit
|
$121,551 |
FTA 5307 Chicago UZA |
NIR-25-006 |
|
GPTC |
Operating Assistance |
Transit
|
$2,235,218 |
FTA 5307 Chicago UZA |
NIRPC2700646 |
|
GPTC |
Operating Assistance |
Transit
|
$2,367,590 |
FTA 5307 Chicago UZA |
NIR-25-010 |
|
GPTC |
Vehicle replacement |
Transit
|
$5,450,000 |
FTA 5307 Chicago UZA |
NIR-25-008 |
|
GPTC |
Preventative Maintenance |
Transit
|
$9,036,906 |
FTA 5307 Chicago UZA |
NIRPC2700650 |
|
GPTC |
Purchase 35' vehicles-FUTURE PROJECT |
Transit
|
$2,000,000 |
FTA 5307 Chicago UZA |
NIR-25-004 |
|
GPTC |
Operating Assistance |
Transit
|
$2,114,762 |
FTA 5307 Chicago UZA |
NIRPC2700648 |
|
GPTC |
JARC Operating Assistance |
Transit
|
$2,690,026 |
FTA 5307 Chicago UZA |
NIRPC2700652 |
|
GPTC |
3 BOC Vans |
Transit
|
$287,500 |
FTA 5339 Chicago UZA |
NIR-25-009 |
|
GPTC |
Vehicle Replacement |
Transit
|
$192,500 |
FTA 5339 Chicago UZA |
NIRPC2700654 |
|
GPTC |
Maintenance Facility Improvements |
Transit
|
$125,000 |
FTA 5339 Chicago UZA |
NIR-24-010 |
|
GPTC |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$1,350,000 |
FTA 5339 Chicago UZA |
NIR-25-012 |
|
GPTC |
Station Improvements |
Transit
|
$69,000 |
FTA 5339 Chicago UZA |
2101119 |
R-44002
|
Griffith |
Roundabout at Broad St and Ave H |
Intersection
|
$2,603,896 |
STBG Chicago UZA |
2300727 |
|
Hammond |
Columbia Avenue from 164th Place to River Drive-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$8,773,826 |
STBG Chicago UZA |
2300661 |
|
Hammond |
Columbia Avenue from 165th Street to Michigan Street (PEL Study) |
Other
|
$589,000 |
STBG Chicago UZA |
2101128 |
R-44060
|
Hammond |
Trail on Michigan St bridge over Kennedy |
Bridge
|
$900,393 |
STBG Chicago UZA |
1901902 |
R-42312
|
Hammond |
Pavement Rehabilitation; complete Streets |
Road Recons/Rehab/Resurf
|
$6,118,000 |
STBG Chicago UZA |
2002586 |
R-43589
|
Hammond |
Hohman Complete Streets |
Road Op & Maint
|
$2,884,000 |
STBG Chicago UZA |
2300656 |
|
Hammond |
Marquette Greenway (trail) from 150th to 100 feet east of East Chicago city limits |
Bike/Ped
|
$962,614 |
TAP Chicago UZA |
2002582 |
|
Highland |
Signal on Erie Lackawanna Trail |
Bike/Ped
|
$350,000 |
HSIP Chicago UZA |
1902707 |
R-42620
|
Hobart |
Roundabout Hobart - 61st Ave & Marcella Dr |
Intersection
|
$5,996,250 |
CMAQ Chicago UZA |
2301203 |
|
Hobart |
City of Hobart and Lake Station HD CNG Trucks & Infrastructure (2026) |
Other
|
$2,528,700 |
CMAQ Chicago UZA CRP Chicago UZA |
2301204 |
|
Hobart |
CNG infrastructure upgrades |
Other
|
$439,500 |
CRP Chicago UZA |
1801911 |
B-41850
|
INDOT |
Bridge over Canadian National(LocalTraxx)(Schererville)(Phase 1) |
Bridge
|
$15,235,662 |
Federal Special |
1900835 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$5,150,955 |
Federal Special |
1801912 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$7,840,832 |
Federal Special |
1801907 |
|
INDOT |
Bridge over Norfolk Southern |
Bridge
|
$12,719,479 |
Federal Special |
2400584 |
T-45653
|
INDOT |
Electric Vehicle Charging Infrastructure |
Other
|
$330,205 |
Federal Special |
2002545 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$447,400 |
Federal Special |
1900833 |
|
INDOT |
Bridge over Norfolk Southern Local TRAXX |
Bridge
|
$4,754,922 |
Federal Special STBG Group III |
2400600 |
R-45602
|
INDOT |
ADA Sidewalk Ramp Construction-FUTURE PROJECT |
Other
|
$360,000 |
HSIP Chicago UZA |
2101654 |
R-45604
|
INDOT |
ADA Sidewalk Ramp Construction-FUTURE PROJECT |
Other
|
$616,000 |
HSIP Chicago UZA |
2200175 |
B-44263
|
INDOT |
Bridge Replacement; Indiana Dunes State Park |
Bridge
|
$5,974,836 |
Local Bridge |
2200738 |
B-44367
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$622,444 |
NHPP Interstate |
1700299 |
|
INDOT |
Bridge Painting at I 94 |
Bridge
|
$1,100,040 |
NHPP Interstate |
2002147 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$1,104,067 |
NHPP Interstate |
2200821 |
R-44635
|
INDOT |
District Pavement Project (Interstate) |
Other
|
$17,340,510 |
NHPP Interstate |
2000778 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$2,592,889 |
NHPP Interstate |
2101046 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$3,000,000 |
NHPP Interstate |
2002122 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$982,623 |
NHPP Interstate |
1592882 |
|
INDOT |
District Small Structure Project |
Other
|
$15,000,000 |
NHPP Interstate |
2101104 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$246,538 |
NHPP Interstate |
2201703 |
|
INDOT |
LaPorte District CCTV Camera Lowering Arms & Pole Wiring Replacement - FY 26 |
ITS
|
$349,088 |
NHPP Interstate |
2200534 |
B-44639
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,392,750 |
NHPP Interstate |
2200739 |
B-44638
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$542,560 |
NHPP Interstate |
2002120 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$11,600,309 |
NHPP Interstate |
2300271 |
T-42591
|
INDOT |
Advanced ITS Preservation |
ITS
|
$14,454,000 |
NHPP Interstate |
2002146 |
B-43350
|
INDOT |
Bridge Thin Deck Overlay in Lake County |
Other
|
$1,229,525 |
NHPP Interstate |
1900042 |
|
INDOT |
District Bridge Project |
Other
|
$2,214,968 |
NHPP Interstate |
2000777 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,006,181 |
NHPP Interstate |
1900044 |
|
INDOT |
District Bridge Project |
Other
|
$2,073,720 |
NHPP Interstate |
2101032 |
R-43932
|
INDOT |
District Pavement Project (Interstate) |
Other
|
$7,498,396 |
NHPP Interstate |
2000852 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$7,108,662 |
NHPP Interstate |
2002121 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$2,160,108 |
NHPP Interstate |
2100220 |
R-43932
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$7,345,275 |
NHPP Interstate |
2201177 |
|
INDOT |
Camera/Communications/Detection/DMS Replacements in Northwest IN ATMS area - FY 26 |
ITS
|
$100,000 |
NHPP Interstate |
2201705 |
|
INDOT |
LaPorte District ITS Communications Shelter Replacements - FY 26 |
ITS
|
$232,725 |
NHPP Interstate |
2000770 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,141,984 |
NHPP Interstate |
1900039 |
|
INDOT |
District Bridge Project |
Other
|
$11,737,312 |
NHPP Interstate |
##561##
561 transportation project(s)
|
|
|
1601147 |
R-39625
|
Burns Harbor |
Multi-use Trail Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$809,176 |
CMAQ Chicago UZA |
2101110 |
R-43999
|
Cedar Lake |
Complete Streets sidewalks on 133rd and Morris |
Bike/Ped
|
$2,326,625 |
CMAQ Chicago UZA STBG Chicago UZA TAP Chicago UZA |
2301117 |
R-45009
|
Cedar Lake |
133rd Avenue Road Raise-Flood Reduction Project |
Road Recons/Rehab/Resurf
|
$837,509 |
STBG Chicago UZA |
2300654 |
R-45008
|
Cedar Lake |
Founders Creek Multi-Use Trail-FUTURE PROJECT |
Bike/Ped
|
$1,882,723 |
STBG Chicago UZA |
2401585 |
|
Cedar Lake |
Centerline & Edge Line Rumble Stripes on Parrish Ave |
Other
|
$162,000 |
|
2401579 |
|
Cedar Lake |
Signing Modernization on multiple streets in Cedar Lake |
Sign
|
$28,000 |
|
1902832 |
R-42649
|
Chesterton |
Multi-use paths / Westchester-Liberty Phase 3 |
Other
|
$1,592,000 |
CRP Chicago UZA TAP Chicago UZA |
2101117 |
|
Chesterton |
Installation of EVP devises on traffic signals |
Signal
|
$2,167,476 |
HSIP Chicago UZA |
1901948 |
R-43177
|
Crown Point |
Intersection Improvement-Roundabout US 231 & 113th |
Intersection
|
$2,514,810 |
STBG Chicago UZA |
2400093 |
|
DNR |
Wilson Rd over Dunes Creek - Dunes State Park |
Bridge
|
$2,300,000 |
Local Bridge |
2300655 |
R-45010
|
Dyer |
Pennsy-Dyer Trail |
Bike/Ped
|
$3,090,126 |
TAP Chicago UZA |
NIR-25-003 |
|
E C Transit |
Transit Asset Management/2025-2026 Preventative Maintenance |
Transit
|
$500,000 |
FTA 5307 Chicago UZA |
NIR-25-001 |
|
E C Transit |
Complementary paratransit service |
Transit
|
$738,858 |
FTA 5307 Chicago UZA |
NIR-25-002 |
|
E C Transit |
Maintain Existing Route Service |
Transit
|
$884,060 |
FTA 5307 Chicago UZA |
NIR-24-002 |
|
E C Transit |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
NIR-24-001 |
|
E C Transit |
Transit/Operating / 2024 Comp Paratransit |
Transit
|
$378,164 |
FTA 5307 Chicago UZA |
NIR-24-003 |
|
E C Transit |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$250,000 |
FTA 5307 Chicago UZA |
2301104 |
|
East Chicago |
East Chicago Clean Fuel Equipment (2025) |
Other
|
$815,510 |
CMAQ Chicago UZA |
1601146 |
R-39624
|
East Chicago |
Multi-use Trails Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$2,914,400 |
CMAQ Chicago UZA |
2301105 |
|
East Chicago |
East Chicago Electric Vehicles |
Other
|
$450,000 |
CRP Chicago UZA |
2101118 |
R-44001
|
East Chicago |
Michigan Ave Reconstruction |
Road Recons/Rehab/Resurf
|
$8,222,168 |
STBG Chicago UZA |
2300726 |
R-45020
|
East Chicago |
Michigan Avenue from Sheridan Place to Broadway Street-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$3,138,996 |
STBG Chicago UZA |
2401593 |
|
East Chicago |
Sign Modernization on all city owned arterials |
Sign
|
$500,000 |
|
1902830 |
|
Gary |
Signal Modernization 5th Ave & Bigger St. |
Signal
|
$498,256 |
HSIP Chicago UZA |
2300662 |
|
Gary |
Airport Road Relocation Project |
Road Recons/Rehab/Resurf
|
$600,000 |
STBG Chicago UZA |
1802973 |
|
Gary |
Roadway Improvement Program / Road Reconstruction (3R/4R Standards) at 15th Ave |
Road Recons/Rehab/Resurf
|
$4,478,000 |
STBG Chicago UZA |
1802975 |
R-42184
|
Gary |
Road Rehabilitation (3R/4R) Airport Rd Phase IV |
Road Recons/Rehab/Resurf
|
$896,000 |
STBG Chicago UZA |
NIRPC2600420 |
|
Gary |
5th Ave On Road Trail |
Road
|
$0 |
|
NIRPC2700657 |
|
GPTC |
Microtransit in Westlake or Hobart Areas |
Transit
|
$2,626,875 |
CMAQ Chicago UZA |
NIR-25-013 |
|
GPTC |
Transit Expansion - Hobart Yrs 1-3 |
Transit
|
$2,812,500 |
CMAQ Chicago UZA |
NIRPC2700538 |
|
GPTC |
vehicle replacement |
Transit
|
$105,000 |
FTA 5307 Chicago UZA |
NIR-25-011 |
|
GPTC |
simulator for driver training |
Transit
|
$370,000 |
FTA 5307 Chicago UZA |
NIR-24-004 |
|
GPTC |
Transit/Customer Exp. / 2024 Trans. Facilities |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIRPC2700649 |
|
GPTC |
Planning |
Other
|
$250,000 |
FTA 5307 Chicago UZA |
NIR-25-004 |
|
GPTC |
Operating Assistance |
Transit
|
$2,114,762 |
FTA 5307 Chicago UZA |
NIRPC2700650 |
|
GPTC |
Purchase 35' vehicles-FUTURE PROJECT |
Transit
|
$2,000,000 |
FTA 5307 Chicago UZA |
NIR-25-010 |
|
GPTC |
Vehicle replacement |
Transit
|
$5,450,000 |
FTA 5307 Chicago UZA |
NIRPC2700637 |
|
GPTC |
Preventive Maintenance |
Transit
|
$8,354,510 |
FTA 5307 Chicago UZA |
NIR-25-008 |
|
GPTC |
Preventative Maintenance |
Transit
|
$9,036,906 |
FTA 5307 Chicago UZA |
NIR-24-009 |
|
GPTC |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
NIR-24-005 |
|
GPTC |
Transit/Operating / 2024 Comp Paratransit |
Transit
|
$973,925 |
FTA 5307 Chicago UZA |
NIR-24-006 |
|
GPTC |
Transit/Operating / 2024 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIR-24-007 |
|
GPTC |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$1,552,558 |
FTA 5307 Chicago UZA |
NIR-25-005 |
|
GPTC |
Operating Assistance |
Transit
|
$2,994,103 |
FTA 5307 Chicago UZA |
NIR-25-006 |
|
GPTC |
Operating Assistance |
Transit
|
$2,235,218 |
FTA 5307 Chicago UZA |
NIRPC2700645 |
|
GPTC |
ADA |
Transit
|
$2,376,312 |
FTA 5307 Chicago UZA |
NIRPC2700646 |
|
GPTC |
Operating Assistance |
Transit
|
$2,367,590 |
FTA 5307 Chicago UZA |
NIRPC2700648 |
|
GPTC |
JARC Operating Assistance |
Transit
|
$2,690,026 |
FTA 5307 Chicago UZA |
NIR-24-008 |
|
GPTC |
Planning / 2024 Planning |
Transit
|
$121,551 |
FTA 5307 Chicago UZA |
NIR-25-007 |
|
GPTC |
Transit Planning |
Transit
|
$200,000 |
FTA 5307 Chicago UZA |
NIRPC2700652 |
|
GPTC |
3 BOC Vans |
Transit
|
$287,500 |
FTA 5339 Chicago UZA |
NIR-25-012 |
|
GPTC |
Station Improvements |
Transit
|
$69,000 |
FTA 5339 Chicago UZA |
NIR-24-010 |
|
GPTC |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$1,350,000 |
FTA 5339 Chicago UZA |
NIR-25-009 |
|
GPTC |
Vehicle Replacement |
Transit
|
$192,500 |
FTA 5339 Chicago UZA |
NIRPC2700654 |
|
GPTC |
Maintenance Facility Improvements |
Transit
|
$125,000 |
FTA 5339 Chicago UZA |
2101119 |
R-44002
|
Griffith |
Roundabout at Broad St and Ave H-FUTURE PROJECT |
Intersection
|
$4,625,830 |
STBG Chicago UZA |
2300727 |
R-45014
|
Hammond |
Columbia Avenue from 164th Place to River Drive-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$8,773,826 |
STBG Chicago UZA |
2300661 |
|
Hammond |
Columbia Avenue from 165th Street to Michigan Street (PEL Study) |
Other
|
$589,000 |
STBG Chicago UZA |
2002586 |
R-43589
|
Hammond |
Hohman Complete Streets |
Road Op & Maint
|
$4,791,377 |
STBG Chicago UZA |
2101128 |
R-44060
|
Hammond |
Trail on Michigan St bridge over Kennedy |
Bridge
|
$900,393 |
STBG Chicago UZA |
1901902 |
R-42312
|
Hammond |
Pavement Rehabilitation; complete Streets |
Road Recons/Rehab/Resurf
|
$6,118,000 |
STBG Chicago UZA |
2300656 |
R-45012
|
Hammond |
Marquette Greenway (trail) from 150th to 100 feet east of East Chicago city limits |
Bike/Ped
|
$1,067,941 |
TAP Chicago UZA |
2401586 |
|
Hammond |
New Sign Installation throughout the City of Hammond |
Sign
|
$600,000 |
|
2002582 |
|
Highland |
Signal on Erie Lackawanna Trail |
Bike/Ped
|
$350,000 |
HSIP Chicago UZA |
1902707 |
R-42620
|
Hobart |
Roundabout Hobart - 61st Ave & Marcella Dr |
Intersection
|
$5,996,250 |
CMAQ Chicago UZA |
2301203 |
|
Hobart |
City of Hobart and Lake Station HD CNG Trucks & Infrastructure (2026) |
Other
|
$2,528,700 |
CMAQ Chicago UZA CRP Chicago UZA |
2301204 |
|
Hobart |
CNG infrastructure upgrades |
Other
|
$439,500 |
CRP Chicago UZA |
1801912 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$7,840,832 |
Federal Special |
1801911 |
B-41850
|
INDOT |
Bridge over Canadian National(LocalTraxx)(Schererville)(Phase 1) |
Bridge
|
$15,235,662 |
Federal Special |
1801907 |
|
INDOT |
Bridge over Norfolk Southern |
Bridge
|
$12,719,479 |
Federal Special |
2002545 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$447,400 |
Federal Special |
2400584 |
T-45653
|
INDOT |
Electric Vehicle Charging Infrastructure |
Other
|
$330,205 |
Federal Special |
1900835 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$5,150,955 |
Federal Special |
1901643 |
T-42591
|
INDOT |
ITS Traffic Management |
ITS
|
$245,481,923 |
Federal Special NHPP Interstate |
1900833 |
|
INDOT |
Bridge over Norfolk Southern Local TRAXX |
Bridge
|
$4,754,922 |
Federal Special STBG Group III |
2400600 |
R-45602
|
INDOT |
ADA Sidewalk Ramp Construction-FUTURE PROJECT |
Other
|
$520,000 |
HSIP Chicago UZA |
2200175 |
B-44263
|
INDOT |
Bridge Replacement; Indiana Dunes State Park |
Bridge
|
$5,974,836 |
Local Bridge |
2101157 |
R-43922
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$13,410,221 |
NHPP Interstate |
2100220 |
R-43932
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$19,500,000 |
NHPP Interstate |
2100557 |
R-43932
|
INDOT |
District Pavement Project (Interstate) |
Other
|
$26,034,511 |
NHPP Interstate |
2200821 |
R-44635
|
INDOT |
District Pavement Project (Interstate) |
Other
|
$20,812,665 |
NHPP Interstate |
2301138 |
|
INDOT |
District Pavement Project (Interstate)-FUTURE PROJECT |
Other
|
$49,128,841 |
NHPP Interstate |
2401489 |
R-45373
|
INDOT |
District Pavement Project (Interstate)-FUTURE PROJECT |
Other
|
$23,182,241 |
NHPP Interstate |
2100239 |
R-43920
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$8,391,373 |
NHPP Interstate |
2000052 |
|
INDOT |
Intersection Improvement Project in Lake County |
Other
|
$2,118,000 |
NHPP Interstate |
2201705 |
|
INDOT |
LaPorte District ITS Communications Shelter Replacements - FY 26 |
ITS
|
$232,725 |
NHPP Interstate |
2201703 |
|
INDOT |
LaPorte District CCTV Camera Lowering Arms & Pole Wiring Replacement - FY 26 |
ITS
|
$349,088 |
NHPP Interstate |
1800885 |
|
INDOT |
ITS Maintenance |
ITS
|
$300,000 |
NHPP Interstate |
2101112 |
|
INDOT |
Camera/Communications/Detection/DMS Replacements in Northwest IN ATMS area - FY 25 |
ITS
|
$100,000 |
NHPP Interstate |
2201177 |
|
INDOT |
Camera/Communications/Detection/DMS Replacements in Northwest IN ATMS area - FY 26 |
ITS
|
$100,000 |
NHPP Interstate |
2300271 |
T-42591
|
INDOT |
Advanced ITS Preservation |
ITS
|
$14,454,000 |
NHPP Interstate |
1592882 |
|
INDOT |
District Small Structure Project-FUTURE PROJECT |
Other
|
$23,538,475 |
NHPP Interstate |
2101765 |
T-43258
|
INDOT |
Overhead Sign Install |
Signal
|
$1,029,508 |
NHPP Interstate |
1900039 |
|
INDOT |
District Bridge Project |
Other
|
$11,737,312 |
NHPP Interstate |
1900040 |
|
INDOT |
District Bridge Project |
Other
|
$2,214,968 |
NHPP Interstate |
1900041 |
|
INDOT |
District Bridge Project |
Other
|
$2,214,968 |
NHPP Interstate |
1900042 |
|
INDOT |
District Bridge Project |
Other
|
$2,214,968 |
NHPP Interstate |
1900044 |
|
INDOT |
District Bridge Project |
Other
|
$2,073,720 |
NHPP Interstate |
1900045 |
|
INDOT |
District Bridge Project |
Other
|
$2,073,720 |
NHPP Interstate |
2002346 |
B-43364
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$4,304,165 |
NHPP Interstate |
2100561 |
B-43921
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,827,600 |
NHPP Interstate |
2200625 |
R-44652
|
INDOT |
District Small Structure Project |
Other
|
$209,454 |
NHPP Interstate |
2300974 |
R-45373
|
INDOT |
Small Structure Pipe Lining-FUTURE PROJECT |
Other
|
$616,168 |
NHPP Interstate |
2101032 |
R-43932
|
INDOT |
Small Structure Maintenance/Repair/Replacement |
Other
|
$10,967,855 |
NHPP Interstate |
2101034 |
R-43932
|
INDOT |
Small Structure Maintenance/Repair/Replacement |
Other
|
$12,433,037 |
NHPP Interstate |
1700299 |
|
INDOT |
Bridge Painting at I 94 |
Bridge
|
$1,100,040 |
NHPP Interstate |
1700298 |
|
INDOT |
Bridge Painting at I 94 |
Bridge
|
$1,227,040 |
NHPP Interstate |
1902735 |
45262
|
INDOT |
Welcome Center Renovation |
Other
|
$52,201,992 |
NHPP Interstate |
2200449 |
|
INDOT |
I80 @ SR 912 interchange INSWMP mitigation for partially unsuccessful mitigation sites |
Other
|
$1,301,500 |
NHPP Interstate |
1601031 |
B-44198
|
INDOT |
Bridge Deck Overlay at I 80 |
Bridge
|
$2,969,477 |
NHPP Interstate |
1500674 |
|
INDOT |
Bridge Deck Overlay at I 80 |
Bridge
|
$4,351,000 |
NHPP Interstate |
2300684 |
R-45120
|
INDOT |
Access Control Project (Right-of-Way)
-FUTURE PROJECT |
Other
|
$2,940,612 |
NHPP Interstate |
2300687 |
R-45128
|
INDOT |
Access Control Project (Right-of-Way)-FUTURE PROJECT |
Other
|
$5,771,906 |
NHPP Interstate |
2300690 |
R-45129
|
INDOT |
Access Control Project (Right of Way)-FUTURE PROJECT |
Other
|
$5,480,877 |
NHPP Interstate |
2000778 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$2,592,889 |
NHPP Interstate |
2000784 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$2,580,093 |
NHPP Interstate |
2000787 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,915,314 |
NHPP Interstate |
2000777 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,006,181 |
NHPP Interstate |
2002120 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$11,600,309 |
NHPP Interstate |
2002121 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$2,160,108 |
NHPP Interstate |
2002347 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$3,081,008 |
NHPP Interstate |
2002344 |
B-43355
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$1,932,259 |
NHPP Interstate |
2100666 |
R-43922
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,747,935 |
NHPP Interstate |
2100646 |
B-43923
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$2,445,000 |
NHPP Interstate |
2100587 |
B-43923
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,047,516 |
NHPP Interstate |
2101048 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,075,000 |
NHPP Interstate |
2200533 |
B-44639
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,866,467 |
NHPP Interstate |
2200534 |
B-44639
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,392,750 |
NHPP Interstate |
2300897 |
B-45111
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$3,493,466 |
NHPP Interstate |
2300898 |
B-45111
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$2,684,731 |
NHPP Interstate |
2401441 |
B-45820
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$1,662,790 |
NHPP Interstate |
2000852 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$7,108,662 |
NHPP Interstate |
2101046 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$4,715,731 |
NHPP Interstate |
2101047 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$4,715,731 |
NHPP Interstate |
2300895 |
B-45111
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$3,381,715 |
NHPP Interstate |
2300896 |
B-45111
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$4,083,601 |
NHPP Interstate |
2101103 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$336,308 |
NHPP Interstate |
2101104 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,120,000 |
NHPP Interstate |
2101105 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,020,000 |
NHPP Interstate |
2200737 |
B-44636
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$715,429 |
NHPP Interstate |
2200738 |
B-44367
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$810,954 |
NHPP Interstate |
2200739 |
B-44638
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$542,560 |
NHPP Interstate |
2200740 |
B-44638
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$532,560 |
NHPP Interstate |
2200537 |
B-44653
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,060,882 |
NHPP Interstate |
2300894 |
B-45111
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$2,345,200 |
NHPP Interstate |
2000425 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$878,199 |
NHPP Interstate |
2000430 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$883,199 |
NHPP Interstate |
2000758 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$4,230,598 |
NHPP Interstate |
2000770 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,141,984 |
NHPP Interstate |
2000772 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,012,350 |
NHPP Interstate |
2000414 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$4,455,138 |
NHPP Interstate |
2000416 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,162,033 |
NHPP Interstate |
2000419 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,023,952 |
NHPP Interstate |
2000421 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$968,817 |
NHPP Interstate |
2002122 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$982,623 |
NHPP Interstate |
2002123 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$982,623 |
NHPP Interstate |
2002146 |
B-43350
|
INDOT |
Bridge Thin Deck Overlay in Lake County |
Other
|
$1,229,525 |
NHPP Interstate |
2002147 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$1,104,067 |
NHPP Interstate |
2002148 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$1,179,136 |
NHPP Interstate |
2100873 |
B-43442
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$747,000 |
NHPP Interstate |
2100874 |
B-43442
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$673,000 |
NHPP Interstate |
2200751 |
R-44635
|
INDOT |
Bridge Thin Deck Overlay |
Other
|
$719,756 |
NHPP Interstate |
2200750 |
R-44635
|
INDOT |
Bridge Thin Deck Overlay |
Other
|
$718,956 |
NHPP Interstate |
2000495 |
R-43004
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$12,862,000 |
NHPP Interstate |
2100232 |
R-43875
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$5,449,210 |
NHPP Interstate NHPP Non Interstate |
1800257 |
|
INDOT |
Bridge Replacement |
Bridge
|
$12,723,000 |
NHPP Interstate NHPP Non Interstate |
2200967 |
R-44656
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$8,124,710 |
NHPP Interstate NHPP Non Interstate |
1703001 |
|
INDOT |
Bridge Replacement |
Bridge
|
$3,454,181 |
NHPP Non Interstate |
1700359 |
|
INDOT |
Bridge Deck Overlay at SR 912 |
Bridge
|
$5,396,383 |
NHPP Non Interstate |
1700370 |
|
INDOT |
Bridge Deck Overlay at SR 912 |
Bridge
|
$1,626,654 |
NHPP Non Interstate |
1800533 |
|
INDOT |
Bridge Painting |
Bridge
|
$1,691,546 |
NHPP Non Interstate |
1703000 |
|
INDOT |
Pedestrian bridge removal |
Bridge
|
$855,294 |
NHPP Non Interstate |
1703012 |
|
INDOT |
Bridge Removal |
Bridge
|
$210,399 |
NHPP Non Interstate |
1703011 |
|
INDOT |
Bridge Removal |
Bridge
|
$55,391,303 |
NHPP Non Interstate |
1296364 |
|
INDOT |
Bridge Painting at SR 49 |
Bridge
|
$655,411 |
NHPP Non Interstate |
1800628 |
|
INDOT |
Bridge Painting |
Bridge
|
$1,656,873 |
NHPP Non Interstate |
1702993 |
|
INDOT |
Auxililary Lanes, Two Way Left Turn Lanes |
Road Recons/Rehab/Resurf
|
$37,446,628 |
NHPP Non Interstate |
1702992 |
|
INDOT |
Auxiliary Lanes, Two Way Left Turn Lanes |
Road Recons/Rehab/Resurf
|
$20,969,061 |
NHPP Non Interstate |
2300274 |
|
INDOT |
National Electric Vehicle Infrastructure (NEVI) Program |
Other
|
$79,181,845 |
NHPP Non Interstate |
1703002 |
|
INDOT |
Bridge Replacement |
Bridge
|
$1,120,271 |
NHPP Non Interstate |
1800622 |
|
INDOT |
Bridge Painting |
Bridge
|
$2,700,866 |
NHPP Non Interstate |
1700025 |
|
INDOT |
Adding center left turn lane |
Road Recons/Rehab/Resurf
|
$19,332,950 |
NHPP Non Interstate |
1702989 |
|
INDOT |
Intersection Improvement; Roundabout |
Intersection
|
$3,481,480 |
NHPP Non Interstate |
2000039 |
R-41441
|
INDOT |
Bridge Deck Overlay |
Bridge
|
$1,597,467 |
NHPP Non Interstate |
2000214 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,002,207 |
NHPP Non Interstate |
2000792 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,247,574 |
NHPP Non Interstate |
2000825 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$3,220,171 |
NHPP Non Interstate |
2000397 |
B-43020
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$660,179 |
NHPP Non Interstate |
2000789 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$598,618 |
NHPP Non Interstate |
2000811 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$718,991 |
NHPP Non Interstate |
2000819 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,503,222 |
NHPP Non Interstate |
2000213 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,396,364 |
NHPP Non Interstate |
2000396 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$622,254 |
NHPP Non Interstate |
2002038 |
B-43332
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$2,604,324 |
NHPP Non Interstate |
2002039 |
B-43332
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$1,221,810 |
NHPP Non Interstate |
2002079 |
B-43337
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$3,375,591 |
NHPP Non Interstate |
2002080 |
B-43337
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$1,099,986 |
NHPP Non Interstate |
2000398 |
43140
|
INDOT |
Bridge deck Overlay |
Bridge
|
$2,746,630 |
NHPP Non Interstate |
2100703 |
B-43873
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,318,278 |
NHPP Non Interstate |
2100635 |
B-43873
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$742,642 |
NHPP Non Interstate |
2100586 |
R-43889
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,072,725 |
NHPP Non Interstate |
2100665 |
R-43889
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$3,564,065 |
NHPP Non Interstate |
2100667 |
R-43889
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$986,000 |
NHPP Non Interstate |
2100641 |
B-43915
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,055,070 |
NHPP Non Interstate |
2100749 |
B-43876
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,111,810 |
NHPP Non Interstate |
2200549 |
B-44666
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$898,951 |
NHPP Non Interstate |
2200814 |
B-44730
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$346,466 |
NHPP Non Interstate |
1901411 |
R-42494
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$2,171,464 |
NHPP Non Interstate |
2301272 |
B-45204
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$962,134 |
NHPP Non Interstate |
2401161 |
B-45816
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$1,163,879 |
NHPP Non Interstate |
2101045 |
R-43932
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,920,000 |
NHPP Non Interstate |
2200712 |
B-44653
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$565,874 |
NHPP Non Interstate |
1901402 |
B-42502
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$70,000 |
NHPP Non Interstate |
2401265 |
B-45801
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Bridge
|
$916,830 |
NHPP Non Interstate |
1700105 |
B-44264
|
INDOT |
District Bridge Project (Removal) |
Bridge
|
$210,399 |
NHPP Non Interstate |
1900009 |
|
INDOT |
District Bridge Project |
Bridge
|
$19,960,000 |
NHPP Non Interstate |
1900012 |
|
INDOT |
District Bridge Project |
Bridge
|
$9,375,441 |
NHPP Non Interstate |
2000402 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$681,380 |
NHPP Non Interstate |
2000449 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,153,130 |
NHPP Non Interstate |
2000683 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$199,477 |
NHPP Non Interstate |
2000448 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$345,604 |
NHPP Non Interstate |
2000411 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$492,808 |
NHPP Non Interstate |
2001994 |
B-43360
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Other
|
$373,666 |
NHPP Non Interstate |
2100621 |
B-43913
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,651,769 |
NHPP Non Interstate |
1901416 |
B-39043
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,816,730 |
NHPP Non Interstate |
2200857 |
B-44728
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$440,878 |
NHPP Non Interstate |
2200987 |
B-44730
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$268,061 |
NHPP Non Interstate |
2400458 |
B-43906
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$559,900 |
NHPP Non Interstate |
2400482 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,182,985 |
NHPP Non Interstate |
2400455 |
|
INDOT |
District Bridge Project (Rehabilitation)
|
Other
|
$534,552 |
NHPP Non Interstate |
2401195 |
|
INDOT |
District Bridge Project (Rehabilitation)
-FUTURE PROJECT |
Other
|
$2,783,938 |
NHPP Non Interstate |
2401168 |
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Other
|
$1,750,514 |
NHPP Non Interstate |
2401221 |
B-45810
|
INDOT |
District Bridge Project (Rehabilitation)
-FUTURE PROJECT |
Other
|
$835,113 |
NHPP Non Interstate |
2401178 |
B-45801
|
INDOT |
District Bridge Project (Rehabilitation)
-FUTURE PROJECT |
Other
|
$1,123,676 |
NHPP Non Interstate |
2401264 |
B-45801
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Other
|
$1,069,481 |
NHPP Non Interstate |
2300840 |
B-45648
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$722,918 |
NHPP Non Interstate |
2200966 |
R-44664
|
INDOT |
District Pavement Project (Non-I) |
Other
|
$8,433,582 |
NHPP Non Interstate |
1901361 |
R-42494
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$6,775,850 |
NHPP Non Interstate |
2200825 |
R-44661
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$6,619,274 |
NHPP Non Interstate |
1901362 |
R-42494
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$2,364,916 |
NHPP Non Interstate |
2301190 |
R-45146
|
INDOT |
District Pavement Project (Non-I)-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$870,387 |
NHPP Non Interstate |
2301213 |
B-45024
|
INDOT |
District Bridge Project, IDIQ |
Other
|
$1,000,000 |
NHPP Non Interstate |
2001759 |
R-43676
|
INDOT |
District Drainage Correction Project |
Other
|
$557,402 |
NHPP Non Interstate |
1900057 |
|
INDOT |
District Pavement Project (Non-I) |
Other
|
$19,171,573 |
NHPP Non Interstate |
1900054 |
|
INDOT |
District Pavement Project |
Other
|
$11,706,357 |
NHPP Non Interstate |
1900055 |
|
INDOT |
District Pavement Project |
Other
|
$11,110,384 |
NHPP Non Interstate |
2002312 |
R-43386
|
INDOT |
District Pavement Project (Non-I) in Lake County |
Other
|
$10,879,141 |
NHPP Non Interstate |
2200926 |
R-44648
|
INDOT |
District Pavement Project (Non-I) |
Other
|
$10,242,985 |
NHPP Non Interstate |
2200829 |
R-44662
|
INDOT |
District Pavement Project (Non-I) |
Other
|
$2,915,317 |
NHPP Non Interstate |
2000606 |
R-43026
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$4,476,680 |
NHPP Non Interstate |
2000607 |
R-43027
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$11,620,010 |
NHPP Non Interstate |
2000609 |
R-43028
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$6,460,853 |
NHPP Non Interstate |
2000610 |
R-43029
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$3,080,026 |
NHPP Non Interstate |
2000613 |
R-43030
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$2,842,902 |
NHPP Non Interstate |
2000614 |
R-43031
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$1,563,686 |
NHPP Non Interstate |
2001884 |
R-43384
|
INDOT |
District Pavement Project (Non-I) in Lake County |
Road Recons/Rehab/Resurf
|
$10,988,820 |
NHPP Non Interstate |
2100222 |
R-43881
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$5,215,211 |
NHPP Non Interstate |
2100221 |
R-43889
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$7,314,887 |
NHPP Non Interstate |
2100236 |
R-43889
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$4,657,569 |
NHPP Non Interstate |
2100238 |
R-43911
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$3,316,046 |
NHPP Non Interstate |
2100241 |
R-43877
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$2,408,965 |
NHPP Non Interstate |
2200965 |
R-44663
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$3,568,542 |
NHPP Non Interstate |
2200969 |
R-44665
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$3,937,080 |
NHPP Non Interstate |
2200486 |
B-44649
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$3,051,199 |
NHPP Non Interstate |
2200827 |
R-44651
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$5,922,822 |
NHPP Non Interstate |
2200828 |
R-44652
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$6,063,078 |
NHPP Non Interstate |
2301119 |
R-45137
|
INDOT |
District Pavement Project (Non-I)
-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$5,108,199 |
NHPP Non Interstate |
2200991 |
B-41439
|
INDOT |
Interchange Modification on US 6 & I-80/94 |
Interchange
|
$5,160,000 |
NHPP Non Interstate |
1702988 |
R-43130
|
INDOT |
District Intersection Improvement Project |
Intersection
|
$1,910,000 |
NHPP Non Interstate |
2000022 |
R-43386
|
INDOT |
District Pavement Project (Non-I) in Lake County |
Intersection
|
$2,437,606 |
NHPP Non Interstate |
2301099 |
R-45136
|
INDOT |
Intersection Improvement Project-FUTURE PROJECT |
Intersection
|
$2,074,317 |
NHPP Non Interstate |
2301097 |
|
INDOT |
Intersection Improvement Project
-FUTURE PROJECT |
Intersection
|
$1,683,330 |
NHPP Non Interstate |
2003099 |
R-43892
|
INDOT |
District Intersection Improvement Project |
Intersection
|
$1,366,995 |
NHPP Non Interstate |
2200043 |
R-44648
|
INDOT |
Intersection Improvement, Roundabout |
Other
|
$1,956,429 |
NHPP Non Interstate |
2200046 |
R-44685
|
INDOT |
District Intersection Improvement Project; roundabout |
Other
|
$7,237,602 |
NHPP Non Interstate |
2003098 |
R-43907
|
INDOT |
District Intersection Improvement Project |
Other
|
$3,770,000 |
NHPP Non Interstate |
2301098 |
|
INDOT |
Intersection Improvement Project
-FUTURE PROJECT |
Intersection
|
$2,715,159 |
NHPP Non Interstate |
1700022 |
R-42251
|
INDOT |
Intersection Improvement Project |
Intersection
|
$6,709,000 |
NHPP Non Interstate |
1702994 |
R-43388
|
INDOT |
District Intersection Improvement Project in Lake County |
Intersection
|
$5,970,000 |
NHPP Non Interstate |
2003097 |
R-43925
|
INDOT |
District Intersection Improvement Project |
Intersection
|
$4,098,300 |
NHPP Non Interstate |
2301074 |
R-45135
|
INDOT |
Intersection Improvement Project-FUTURE PROJECT |
Intersection
|
$3,131,000 |
NHPP Non Interstate |
2300702 |
R-45121
|
INDOT |
Intersection Improvement Project-FUTURE PROJECT |
Intersection
|
$4,015,075 |
NHPP Non Interstate |
2201077 |
R-44684
|
INDOT |
LaPorte District Safety Systemic - New or Slotted Left Turn (No ROW) |
Other
|
$2,490,000 |
NHPP Non Interstate |
2400573 |
|
INDOT |
Planning/Feasibility/Corridor Study Project |
Other
|
$3,000,000 |
NHPP Non Interstate |
1900186 |
|
INDOT |
District Pavement Project |
Road Op & Maint
|
$1,173,582 |
NHPP Non Interstate |
2001885 |
R-43382
|
INDOT |
District Pavement Project (Non-I) in LaPorte County |
Road Op & Maint
|
$20,885,358 |
NHPP Non Interstate |
2100113 |
|
INDOT |
US 30 & US 31 PEL Study |
Other
|
$17,609,931 |
NHPP Non Interstate |
1900037 |
|
INDOT |
District Bridge Project |
Other
|
$1,542,766 |
NHPP Non Interstate |
2100559 |
B-43912
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$10,411,915 |
NHPP Non Interstate |
2100552 |
B-43916
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$2,401,386 |
NHPP Non Interstate |
2301118 |
R-45142
|
INDOT |
Major Pavement Project (NHS)-FUTURE PROJECT |
Other
|
$24,842,073 |
NHPP Non Interstate |
2400457 |
B-45596
|
INDOT |
District Bridge Project (Rehabilitation)-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$905,527 |
NHPP Non Interstate |
2100940 |
R-43857
|
INDOT |
District Small Structure Project |
Other
|
$216,105 |
NHPP Non Interstate |
2400583 |
|
INDOT |
District Small Structure Project-FUTURE PROJECT |
Other
|
$360,000 |
NHPP Non Interstate |
2400514 |
|
INDOT |
District Small Structure Project
-FUTURE PROJECT |
Other
|
$379,230 |
NHPP Non Interstate |
2001935 |
R-43331
|
INDOT |
District Small Structure Project in Porter County |
Other
|
$871,716 |
NHPP Non Interstate |
2002295 |
R-43351
|
INDOT |
Small Structure Pipe Lining |
Other
|
$663,037 |
NHPP Non Interstate |
2100806 |
R-43904
|
INDOT |
District Small Structure Project |
Other
|
$1,103,225 |
NHPP Non Interstate |
2100762 |
B-43915
|
INDOT |
District Small Structure Project |
Other
|
$1,283,634 |
NHPP Non Interstate |
2200622 |
R-44649
|
INDOT |
District Small Structure Project |
Other
|
$239,601 |
NHPP Non Interstate |
2200621 |
R-44657
|
INDOT |
District Small Structure Project |
Other
|
$292,716 |
NHPP Non Interstate |
2200613 |
R-44657
|
INDOT |
District Small Structure Project |
Other
|
$343,591 |
NHPP Non Interstate |
1900016 |
|
INDOT |
District Small Structure Project |
Bridge
|
$1,081,368 |
NHPP Non Interstate |
1900019 |
|
INDOT |
District Small Structure Project |
Bridge
|
$744,595 |
NHPP Non Interstate |
1900020 |
|
INDOT |
District Small Structure Project |
Bridge
|
$592,675 |
NHPP Non Interstate |
2002298 |
R-43358
|
INDOT |
District Small Structure Project in Lake County |
Bridge
|
$1,877,705 |
NHPP Non Interstate |
2002299 |
R-43379
|
INDOT |
District Small Structure Project in LaPorte County |
Bridge
|
$910,150 |
NHPP Non Interstate |
2101096 |
R-43881
|
INDOT |
District Small Structure Project |
Bridge
|
$579,800 |
NHPP Non Interstate |
2100844 |
R-43886
|
INDOT |
District Small Structure Project |
Bridge
|
$2,281,700 |
NHPP Non Interstate |
2101078 |
R-43904
|
INDOT |
District Small Structure Project |
Bridge
|
$538,461 |
NHPP Non Interstate |
2101106 |
R-43874
|
INDOT |
District Small Structure Project |
Bridge
|
$494,907 |
NHPP Non Interstate |
1701335 |
R-43809
|
INDOT |
District Small Structure Project |
Bridge
|
$1,818,253 |
NHPP Non Interstate |
1701334 |
R-43809
|
INDOT |
District Small Structure Project |
Bridge
|
$1,095,377 |
NHPP Non Interstate |
2200623 |
R-44651
|
INDOT |
District Small Structure Project |
Bridge
|
$815,555 |
NHPP Non Interstate |
1902136 |
R-42604
|
INDOT |
Small Structure and Drains Construction |
Other
|
$1,753,120 |
NHPP Non Interstate |
2002398 |
R-43390
|
INDOT |
District Small Structure Project in Jasper and Porter Counties |
Other
|
$2,211,891 |
NHPP Non Interstate |
2200506 |
R-44649
|
INDOT |
District Small Structure Project |
Other
|
$577,195 |
NHPP Non Interstate |
2301158 |
R-45127
|
INDOT |
District Small Structure Project
-FUTURE PROJECT |
Other
|
$727,917 |
NHPP Non Interstate |
2301179 |
R-45127
|
INDOT |
District Small Structure Project-FUTURE PROJECT |
Other
|
$793,946 |
NHPP Non Interstate |
2301157 |
R-45123
|
INDOT |
District Small Structure Project-FUTURE PROJECT |
Other
|
$366,135 |
NHPP Non Interstate |
2200812 |
B-44689
|
INDOT |
District Bridge Project (Rehabilitation) |
Road Recons/Rehab/Resurf
|
$372,710 |
NHPP Non Interstate |
2200815 |
B-44727
|
INDOT |
District Bridge Project (Rehabilitation) |
Road Recons/Rehab/Resurf
|
$588,748 |
NHPP Non Interstate |
2200871 |
B-44729
|
INDOT |
District Bridge Project (Rehabilitation) |
Road Recons/Rehab/Resurf
|
$469,565 |
NHPP Non Interstate |
2101797 |
R-43382
|
INDOT |
District Pavement Project (Non-I) |
Other
|
$17,487,507 |
NHPP Non Interstate |
1600701 |
R-42249
|
INDOT |
Intersection Improvement Project |
Other
|
$2,836,219 |
NHPP Non Interstate |
1703009 |
|
INDOT |
Bridge Replacement |
Bridge
|
$931,767 |
|
1900050 |
|
INDOT |
Intersection Improvement Project |
Road Recons/Rehab/Resurf
|
$12,350,358 |
|
1900834 |
B-41850
|
INDOT |
Bridge over Canadian National(Local Traxx)(Schererville)(Ph 1) |
Bridge
|
$14,273,247 |
|
1900049 |
|
INDOT |
Auxiliary Two-way Left Turn Lane |
Road Recons/Rehab/Resurf
|
$8,232,506 |
|
1901401 |
B-42502
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,108,000 |
|
2301132 |
T-42591
|
INDOT |
Concrete Pavement Restoration on I80/94 |
Road Recons/Rehab/Resurf
|
$43,320,000 |
|
2101654 |
R-45604
|
INDOT |
ADA Sidewalk Ramp Construction |
Other
|
$789,000 |
|
2401388 |
|
INDOT |
Intersection Improvement Project; roundabout |
Intersection
|
$5,086,927 |
|
2400077 |
|
INDOT |
Planning/Feasibility/Corridor Study Project |
Other
|
$1,156,000 |
|
2300671 |
|
INDOT |
PROTECT Program Development |
Other
|
$500,000 |
|
1900830 |
|
INDOT |
N Clark Rd Local Traxx |
Intersection
|
$22,436,060 |
|
2101061 |
T-45737
|
INDOT |
District Pavement Marking Project |
Road Recons/Rehab/Resurf
|
$800,000 |
|
1900031 |
|
INDOT |
District Bridge Project |
Other
|
$2,625,532 |
|
1900036 |
|
INDOT |
District Bridge Project |
Other
|
$2,900,532 |
|
1601089 |
|
INDOT |
Shoulder rehabilitation |
Other
|
$10,571,485 |
|
1900446 |
|
INDOT |
District Bridge Project |
Other
|
$760,223 |
|
1900028 |
|
INDOT |
District Small Structure Project |
Bridge
|
$1,597,799 |
|
1900029 |
|
INDOT |
District Small Structure Project |
Bridge
|
$1,862,661 |
|
1902137 |
R-42605
|
INDOT |
Small Structure and Drains Construction |
Other
|
$2,182,000 |
|
2100030 |
R-43130
|
INDOT |
FY24 Traffic Signal Modernization |
Signal
|
$244,084 |
|
2101060 |
T-45736
|
INDOT |
District Signal Project |
Signal
|
$2,595,757 |
|
1383615 |
|
INDOT |
Intersection Improvement, Roundabout at SR 55 |
Intersection
|
$7,308,559 |
|
2301152 |
|
La Porte |
Alternative Fuel Vehicle |
Other
|
$243,250 |
CMAQ Mich City UZA |
2300723 |
|
La Porte |
City of La Porte - Alternative Fuel Vehicles 1 |
Other
|
$124,000 |
CRP Mich City UZA |
2101142 |
|
La Porte |
North South Corridor |
Road
|
$18,081,766 |
STBG Chicago UZA |
1902008 |
R-42421
|
La Porte |
Pavement Resurface/ Rehabilitation throughout the city |
Road Op & Maint
|
$312,500 |
STBG Mich City UZA |
2300725 |
|
La Porte |
Park Street Intersection Improvement |
Intersection
|
$663,089 |
STBG Mich City UZA |
1902002 |
R-42415
|
La Porte |
Pavement Rehabilitation 3R/4R Park St |
Road Recons/Rehab/Resurf
|
$1,709,287 |
STBG Mich City UZA |
2300018 |
|
La Porte |
City of La Porte Comprehensive and Transportation Plan |
Other
|
$350,000 |
STBG Mich City UZA |
1902007 |
R-42420
|
La Porte |
Sidewalk repair/rehab/construction throughout city-2024 |
Bike/Ped
|
$125,000 |
TAP Mich City UZA |
1900831 |
|
La Porte |
Chessie Trail 2 RR crossing |
Bike/Ped
|
$502,500 |
TAP Mich City UZA |
2401595 |
|
La Porte |
Pedestrian Flashing Beacons in two locations in City of LaPorte |
Signal
|
$790,000 |
|
2401594 |
|
La Porte |
City of LaPorte Sign Replacement |
Sign
|
$1,400,000 |
|
1902676 |
B-42599
|
Lake County |
Veteran's Memorial Parkway Trail Bridge |
Bridge
|
$2,847,610 |
CMAQ Chicago UZA |
2101129 |
B-44005
|
Lake County |
Bridge Replacement Colorado St over Deep River |
Bridge
|
$2,623,783 |
Federal Special STBG Chicago UZA |
1902819 |
B-42829
|
Lake County |
Bridge #45 Bridge Replacement |
Bridge
|
$5,770,550 |
Local Bridge |
2301052 |
B-45018
|
Lake County |
Replacement Lake County Bridge #98, Clay Street over Deep River-FUTURE PROJECT |
Bridge
|
$3,469,611 |
STBG Chicago UZA |
1902675 |
|
Lake County |
Veteran's Memorial Trail (P1) |
Bike/Ped
|
$1,742,754 |
STBG Chicago UZA |
2401591 |
|
Lake County |
Countywide sign modernization |
Sign
|
$77,700 |
|
2301103 |
|
Lake Station |
Lake and Porter County ZEV Project |
Other
|
$4,560,000 |
CRP Chicago UZA |
2300724 |
|
LaPorte County |
La Porte County Goes Green |
Other
|
$228,000 |
CRP Mich City UZA |
1801831 |
R-41660
|
LaPorte County |
Lincoln Trail Extension |
Other
|
$3,001,568 |
DEMO STBG Mich City UZA TAP Mich City UZA |
1902815 |
B-42837
|
LaPorte County |
00.60 S CR 1300 S Bridge Replacement |
Bridge
|
$1,000,000 |
Local Bridge |
2201684 |
|
LaPorte County |
Bridge #214 Replacement-FUTURE PROJECT |
Bridge
|
$1,678,895 |
Local Bridge |
2301619 |
|
LaPorte County |
Bridge #46 over Kankakee River is located on CR 525 S 1/2 mile east of SR 104-FUTURE PROJECT |
Bridge
|
$2,773,298 |
Local Bridge |
2101709 |
|
LaPorte County |
Bridge #94 Replacement-FUTURE PROJECT |
Bridge
|
$1,860,000 |
Local Bridge |
2101711 |
|
LaPorte County |
Bridge #166 Replacement-FUTURE PROJECT |
Bridge
|
$1,630,000 |
Local Bridge |
2201284 |
|
LaPorte County |
La Porte County Bridge Inspections |
Bridge
|
$164,629 |
Local Bridge |
2003036 |
B-44098
|
LaPorte County |
Bridge Rehabilitation; Bridge #104 |
Bridge
|
$1,700,000 |
Local Bridge |
1902029 |
|
LaPorte County |
Bridge Inspection FY 21-24 |
Bridge
|
$524,975 |
Local Bridge |
2301621 |
|
LaPorte County |
Bridge #189 over Pitner Ditch along CR 2300 South between US 421 and Horseshoe Bend Road-FUTURE PROJECT |
Bridge
|
$2,267,611 |
Local Bridge |
1592335 |
R-38992
|
LaPorte County |
Bicycle & Pedestrian Facilities at Marquette /Singing Sands Trail (LPCO) |
Other
|
$1,458,572 |
STBG Group III STBG Mich City UZA |
1902818 |
R-42836
|
LaPorte County |
Unincorporated Union Mills- Sidewalks and ramps |
Bike/Ped
|
$696,750 |
STBG Group IV |
2400757 |
|
LaPorte County |
La Porte County Comprehensive Plan |
Other
|
$180,000 |
STBG Mich City UZA |
2301255 |
|
LaPorte County |
Bridge 7 Replacement Project |
Bridge
|
$2,048,364 |
STBG Mich City UZA |
2101149 |
B-44012
|
LaPorte County |
Bridge Rehabilitation #512-FUTURE PROJECT |
Bridge
|
$5,280,294 |
STBG Mich City UZA |
1802920 |
R-42065
|
Lowell |
Freedom Trail |
Bike/Ped
|
$3,572,125 |
|
NIR-24-017 |
|
MC Transit |
Transit / Operating Assistance / 2024 |
Transit
|
$1,931,154 |
FTA 5307 Mich City UZA |
NIR-25-017 |
|
MC Transit |
Operating Assistance |
Transit
|
$2,925,472 |
FTA 5307 Mich City UZA |
NIRPC2700693 |
|
MC Transit |
Vehicle Replacements |
Transit
|
$740,000 |
STBG Mich City Transfer to FTA |
NIR-24-019 |
|
MC Transit |
Michigan City Transit vehicle replacement |
Transit
|
$350,000 |
STBG Mich City Transfer to FTA |
NIR-24-018 |
|
MC Transit |
Transit / Asset Management / 2024 Vehicle Replacements |
Transit
|
$320,000 |
STBG Mich City Transfer to FTA |
2101131 |
R-44006
|
Merrillville |
Roundabouts at Mississippi & 79th |
Intersection
|
$6,707,525 |
CMAQ Chicago UZA |
2101130 |
R-44109
|
Merrillville |
Roundabout at Mississippi & 69th |
Intersection
|
$2,786,795 |
STBG Chicago UZA |
2300660 |
|
Merrillville |
New Town Center Planning |
Other
|
$275,000 |
STBG Chicago UZA |
2300883 |
|
Merrillville |
61st & Taft (SR 55) Intersection Modification |
Intersection
|
$1,655,568 |
STBG Chicago UZA |
1901951 |
R-42316
|
Merrillville |
Sidewalks in Merrill Heights neighborhood |
Bike/Ped
|
$3,188,225 |
TAP Chicago UZA |
2301256 |
|
Michigan City |
Michigan CIty Sanitary District - CNG Truck Replacement |
Other
|
$1,930,000 |
CMAQ Mich City UZA |
1902691 |
R-42613
|
Michigan City |
On Road Trail; Washington Park Blvd.-FUTURE PROJECT |
Bike/Ped
|
$1,749,091 |
CMAQ Mich City UZA STBG Mich City UZA |
2101148 |
R-44011
|
Michigan City |
Singing Sands Trail Phase III-D |
Bike/Ped
|
$4,187,245 |
Federal Special TAP Mich City UZA |
2101147 |
R-44010
|
Michigan City |
Singing Sands trail phase III-A |
Bike/Ped
|
$2,430,000 |
Federal Special TAP Mich City UZA |
1802785 |
R-41795
|
Michigan City |
Singing Sand 1 RR crossing |
Bike/Ped
|
$1,260,000 |
Rail/Hwy Xings Sec 130 STBG Mich City UZA |
NIRPC2700692 |
|
Michigan City |
Washington Park Boulevard Streetscape-FUTURE PROJECT |
Bike/Ped
|
$1,808,841 |
STBG Group IV STBG Mich City UZA |
2401544 |
|
Michigan City |
Pavement Markings on multiple Streets in Long Beach |
Other
|
$72,000 |
|
1173597 |
R-34603
|
Munster |
Bicycle & Pedestrian Facilities at E-L/Pennsy Trail |
Bike/Ped
|
$2,481,230 |
CRP Chicago UZA TAP Chicago UZA |
NIRPC2700691 |
|
Munster |
Ridge Road Complete Street |
Road Recons/Rehab/Resurf
|
$21,429,151 |
Federal Special |
2300728 |
R-45019
|
Munster |
Safety Improvements - Emergency Vehicle Preemption-FUTURE PROJECT |
Intersection
|
$8,400,000 |
STBG Chicago UZA |
2101132 |
R-44007
|
Munster |
Main St reconstruction |
Road Recons/Rehab/Resurf
|
$7,045,081 |
STBG Chicago UZA |
NIR-24-031 |
|
NICTD |
Transit/Asset management / 2024 Maintenance Overhaul |
Transit
|
$16,875,000 |
FTA 5307 Chicago UZA |
NIR-25-030 |
|
NICTD |
Maintenance Overhaul |
Transit
|
$15,715,315 |
FTA 5307 Chicago UZA |
NIRPC2700617 |
|
NICTD |
2028 Maintenance Overhaul-FUTURE PROJECT |
Transit
|
$11,935,885 |
FTA 5307 Chicago UZA |
NIRPC2700620 |
|
NICTD |
Maintenance Overhaul |
Transit
|
$11,701,848 |
FTA 5307 Chicago UZA |
NIR-25-018 |
|
NICTD |
Track Equipment |
Transit
|
$1,680,000 |
FTA 5337 St of Good Repair |
NIR-25-022 |
|
NICTD |
Track Engineering |
Transit
|
$1,000,000 |
FTA 5337 St of Good Repair |
NIR-25-028 |
|
NICTD |
Railcar End of Life Overhaul |
Transit
|
$13,000,000 |
FTA 5337 St of Good Repair |
NIR-25-027 |
|
NICTD |
MED Improvement Project |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-25-026 |
|
NICTD |
Railcar Mid-Life Overhaul |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-25-025 |
|
NICTD |
Substation Improvements |
Transit
|
$12,334,497 |
FTA 5337 St of Good Repair |
NIR-25-023 |
|
NICTD |
Signal/Catenary Upgrades |
Transit
|
$3,000,000 |
FTA 5337 St of Good Repair |
NIR-25-029 |
|
NICTD |
Facility Improvements |
Transit
|
$1,250,000 |
FTA 5337 St of Good Repair |
NIR-25-031 |
|
NICTD |
Police cameras |
Transit
|
$100,000 |
FTA 5337 St of Good Repair |
NIRPC2700557 |
|
NICTD |
Bridge rehabilitation/ repairs |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-23-110 |
|
NICTD |
Software Replacement/Upgrades |
Transit
|
$200,000 |
FTA 5337 St of Good Repair |
NIR-25-024 |
|
NICTD |
Shop Equipment |
Transit
|
$1,900,000 |
FTA 5337 St of Good Repair |
NIR-24-032 |
|
NICTD |
Transit/Asset Management / 2024 Support Vehicles |
Transit
|
$562,700 |
FTA 5337 St of Good Repair |
NIRPC2700695 |
|
NICTD |
Midlife Rebuild-DELAYED |
Transit
|
$16,000,000 |
FTA 5337 St of Good Repair |
NIR-24-026 |
|
NICTD |
Transit/Asset Management / 2024 Midlife Rebuild |
Transit
|
$1,404,500 |
FTA 5337 St of Good Repair |
NIR-24-027 |
|
NICTD |
Transit/Asset Management / 2024 Endlife Rebuild |
Transit
|
$5,695,500 |
FTA 5337 St of Good Repair |
NIR-24-028 |
|
NICTD |
Transit/Asset management / 2024 Rolling Stock |
Transit
|
$8,000,000 |
FTA 5337 St of Good Repair |
NIR-24-029 |
|
NICTD |
Transit/Asset management / 2024 Track Equipment |
Transit
|
$750,000 |
FTA 5337 St of Good Repair |
NIR-24-030 |
|
NICTD |
Transit/Asset management / 2024 Substation improvements |
Transit
|
$7,779,035 |
FTA 5337 St of Good Repair |
NIR-24-025 |
|
NICTD |
Transit/Asset management / 2024 Bidirectional signaling |
Transit
|
$1,940,693 |
FTA 5337 St of Good Repair |
NIR-24-024 |
|
NICTD |
Transit/Asset Management / 2024 Bridge Rehab |
Transit
|
$1,775,000 |
FTA 5337 St of Good Repair |
NIR-24-023 |
|
NICTD |
Transit/Asset Management / 2024 Track Improvements |
Transit
|
$750,000 |
FTA 5337 St of Good Repair |
NIR-24-022 |
|
NICTD |
Transit/Asset Management / 2024 Signal Catenary Upgrades |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
NIR-24-021 |
|
NICTD |
Transit/Asset Management / 2024 PTC Routers & Servers |
Transit
|
$500,000 |
FTA 5337 St of Good Repair |
NIR-24-020 |
|
NICTD |
Transit/Asset management / 2024 Maint. Equipment |
Transit
|
$260,000 |
FTA 5337 St of Good Repair |
NIRPC2700747 |
|
NICTD |
Computer Replacement |
Transit
|
$350,000 |
FTA 5337 St of Good Repair |
NIRPC2700748 |
|
NICTD |
Track Engineering |
Transit
|
$400,000 |
FTA 5337 St of Good Repair |
NIRPC2700749 |
|
NICTD |
Passenger Communication |
Transit
|
$1,000,000 |
FTA 5337 St of Good Repair |
NIRPC2700750 |
|
NICTD |
Maintenance Vehicle Overhaul |
Transit
|
$1,713,520 |
FTA 5337 St of Good Repair |
NIRPC2700751 |
|
NICTD |
Software Replacement/Upgrades |
Transit
|
$3,500,000 |
FTA 5337 St of Good Repair |
NIRPC2700752 |
|
NICTD |
Transportation Tablets |
Transit
|
$100,000 |
FTA 5337 St of Good Repair |
NIRPC2700753 |
|
NICTD |
Antenna Repeaters |
Transit
|
$150,000 |
FTA 5337 St of Good Repair |
NIRPC2700754 |
|
NICTD |
Track Improvements |
Transit
|
$1,286,480 |
FTA 5337 St of Good Repair |
NIRPC2700755 |
|
NICTD |
Computer Hardware |
Transit
|
$150,000 |
FTA 5337 St of Good Repair |
NIRPC2700756 |
|
NICTD |
PTC Equipment. |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
NIRPC2700757 |
|
NICTD |
South Bend Realignment Engineering |
Transit
|
$800,000 |
FTA 5337 St of Good Repair |
NIRPC2700758 |
|
NICTD |
Fiber line maintenance and repairs. |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
NIRPC2700621 |
|
NICTD |
Bidirectional Signaling |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIRPC2700624 |
|
NICTD |
Passenger Communication Upgrades-FUTURE PROJECT |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
NIRPC2700626 |
|
NICTD |
DT Phase II |
Transit
|
$2,716,199 |
FTA 5337 St of Good Repair |
NIRPC2700627 |
|
NICTD |
Double Track Phase II |
Transit
|
$2,716,199 |
FTA 5337 St of Good Repair |
NIR-23-107 |
|
NICTD |
Facility Improvement |
Transit
|
$2,148,656 |
FTA 5337 St of Good Repair |
NIRPC2700635 |
|
NICTD |
HL1 Railcar Lease |
Transit
|
$5,172,960 |
FTA 5337 St of Good Repair |
NIRPC2700636 |
|
NICTD |
Computer Replacement |
Transit
|
$200,000 |
FTA 5337 St of Good Repair |
NIRPC2700639 |
|
NICTD |
MED Railway Improvement |
Transit
|
$14,200,000 |
FTA 5337 St of Good Repair |
NIR-23-114 |
|
NICTD |
Metra Electric District Capital Investment |
Transit
|
$3,000,000 |
FTA 5337 St of Good Repair |
NIRPC2700659 |
|
NICTD |
Support Vehicles |
Transit
|
$1,659,968 |
FTA 5337 St of Good Repair |
NIR-23-102 |
|
NICTD |
Railcar routers |
Transit
|
$200,000 |
FTA 5337 St of Good Repair |
NIRPC2700666 |
|
NICTD |
PTC Hardware Replacement-FUTURE PROJECT |
Transit
|
$600,000 |
FTA 5337 St of Good Repair |
NIRPC2700668 |
|
NICTD |
Station Improvements-FUTURE PROJECT |
Transit
|
$5,808,624 |
FTA 5337 St of Good Repair |
NIRPC2700696 |
|
NICTD |
Substation Improvements |
Transit
|
$6,800,000 |
FTA 5337 St of Good Repair |
NIRPC2700670 |
|
NICTD |
Substation Improvements-FUTURE PROJECT |
Transit
|
$3,000,000 |
FTA 5337 St of Good Repair |
NIR-23-101 |
|
NICTD |
Track Equipment |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
NIRPC2700672 |
|
NICTD |
Track Improvements |
Transit
|
$2,500,000 |
FTA 5337 St of Good Repair |
NIR-23-108 |
|
NICTD |
Railcar Lease NIRPC2700682 |
Transit
|
$12,335,914 |
FTA 5337 St of Good Repair |
NIRPC2700688 |
|
NICTD |
Railway Improvement Bond Repayment NIRPC2700688 |
Transit
|
$28,400,000 |
FTA 5337 St of Good Repair |
NIR-23-115 |
|
NICTD |
Double Track Phase II Engineering NRPC2700689 |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
MAC-24-100 |
|
NICTD |
South Bend Station Relocation NIRPC2700690 |
Transit
|
$2,417,088 |
FTA 5337 St of Good Repair |
NIRPC2700699 |
|
NICTD |
MED Railway Improvement |
Transit
|
$27,750,000 |
FTA 5337 St of Good Repair |
NIR-25-020 |
|
NICTD |
Rolling Stock Acquisition |
Transit
|
$16,000,000 |
FTA 5337 St of Good Repair |
NIR-25-019 |
|
NICTD |
Support vehicles |
Transit
|
$1,366,351 |
FTA 5337 St of Good Repair |
NIR-25-021 |
|
NICTD |
West Lake Extension |
Transit
|
$29,331,056 |
Federal Special |
NIRPC2700630 |
|
NIRPC |
Drive Clean Indiana Green Fleets Air Quality Public Education |
Other
|
$945,000 |
CMAQ Chicago UZA |
2101675 |
|
NIRPC |
Planning - 2023 TIP Management Software / CMAQ Air Quality Education |
Other
|
$984,003 |
CMAQ Chicago UZA STBG Chicago UZA |
NIR-24-049 |
|
NIRPC |
Planning / 2024 Transit Oversight |
Transit
|
$432,000 |
FTA 5307 Chicago UZA |
NIR-24-048 |
|
NIRPC |
Transit/Operating / 2024 Operational Support Equipment |
Transit
|
$90,616 |
FTA 5307 Chicago UZA |
NIRPC2700702 |
|
NIRPC |
Operational Support Equipment and Route Match |
Transit
|
$181,232 |
FTA 5307 Chicago UZA |
NIRPC2700703 |
|
NIRPC |
Operational Equipment and Route Match |
Transit
|
$181,232 |
FTA 5307 Chicago UZA |
2400062 |
|
NIRPC |
Marquette Greenway Trail, Lake County, in Gary |
Bike/Ped
|
$11,273,248 |
Federal Special |
2400063 |
|
NIRPC |
Marquette Greenway Trail; Porter County, Portaqe |
Bike/Ped
|
$7,387,759 |
Federal Special |
2400750 |
|
NIRPC |
Marquette Greenway Trail; Michigan portion MI211157 |
Bike/Ped
|
$1,284,562 |
Federal Special |
2101675RSA |
|
NIRPC |
Road Safety Audits for Northwest Indiana |
Other
|
$310,000 |
HSIP Chicago UZA |
NIRPC2700511 |
|
NIRPC |
NIRPC Green Fleets Program |
Other
|
$945,000 |
STBG Chicago UZA |
NIR-25-033 |
|
North Township |
Preventative Maintenance |
Transit
|
$108,000 |
FTA 5307 Chicago UZA |
NIR-25-032 |
|
North Township |
Operating Assistance |
Transit
|
$1,075,175 |
FTA 5307 Chicago UZA |
NIR-24-033 |
|
North Township |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$518,350 |
FTA 5307 Chicago UZA |
NIR-24-034 |
|
North Township |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$54,000 |
FTA 5307 Chicago UZA |
NIR-24-035 |
|
North Township |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$84,225 |
FTA 5310 Chicago UZA |
NIR-25-034 |
|
North Township |
Vehicle Replacement |
Transit
|
$173,450 |
FTA 5339 Chicago UZA |
IN-NP-INDU-246664 |
|
NPS-INDU |
Marquette Greenway Broadway to Lake St |
Bike/Ped
|
$3,715,987 |
FLTP |
IN-FTNP-INDU-305176 |
|
NPS-INDU |
Marquette Greenway; Lake St to Grand Blvd. |
Bike/Ped
|
$1,125,000 |
FLTP |
IN-NP-INDU-187645 |
|
NPS-INDU |
Marquette Greenway West Beach to Portage Lakefront |
Bike/Ped
|
$1,353,473 |
FLTP |
NIR-25-035 |
|
OE |
Preventative Maintenance |
Transit
|
$260,800 |
FTA 5307 Chicago UZA |
NIR-24-036 |
|
OE |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$128,000 |
FTA 5307 Chicago UZA |
NIR-24-037 |
|
OE |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$202,300 |
FTA 5307 Chicago UZA |
NIR-25-036 |
|
OE |
Vehicle Replacements |
Transit
|
$437,500 |
FTA 5310 Chicago UZA |
NIR-25-039 |
|
PCACS |
Preventative Maintenance |
Transit
|
$100,000 |
FTA 5307 Chicago UZA |
NIR-25-037 |
|
PCACS |
Operating Assistance |
Transit
|
$575,000 |
FTA 5307 Chicago UZA |
NIR-24-040 |
|
PCACS |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIR-24-039 |
|
PCACS |
Transit/Expansion / 2024 Operations Expansion |
Transit
|
$50,000 |
FTA 5310 Chicago UZA |
NIR-24-038 |
|
PCACS |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$150,000 |
FTA 5310 Chicago UZA |
NIR-25-038 |
|
PCACS |
Operating Assistance |
Transit
|
$210,000 |
FTA 5310 Chicago UZA |
NIR-24-041 |
|
PCACS |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$140,000 |
FTA 5310 Chicago UZA |
NIR-25-040 |
|
PCACS |
Vehicle Replacement |
Transit
|
$301,250 |
FTA 5339 Chicago UZA |
2301054 |
|
Portage |
Portage - Clean Fuel trucks and Equipment |
Other
|
$4,643,819 |
CMAQ Chicago UZA |
2301102 |
|
Portage |
CNG Infrastructure & Electric Equipment |
Other
|
$1,422,600 |
CRP Chicago UZA |
1173430 |
R-45022
|
Portage |
Road Reconstruction (3R/4R Standards) at Central Ave |
Road Recons/Rehab/Resurf
|
$7,983,127 |
DEMO STBG Chicago UZA |
2100131 |
R-44057
|
Portage |
Road Reconstruction; From Brandt St to County Line Rd-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$8,401,250 |
STBG Chicago UZA |
2201679 |
|
Porter County |
Bridge Replacement Bridge 64-00012-FUTURE PROJECT |
Bridge
|
$2,127,000 |
Local Bridge |
2201678 |
|
Porter County |
Bridge Replacement CR 625 West over Breyfogal Ditch-FUTURE PROJECT |
Bridge
|
$2,480,000 |
Local Bridge |
2003042 |
|
Porter County |
Bridge 64-00001 - Division Road over Hutton Ditch - Bridge Replacement |
Bridge
|
$1,974,125 |
Local Bridge |
1802941 |
B-42061
|
Porter County |
Bridge Replacement |
Bridge
|
$1,730,000 |
Local Bridge |
2101692 |
R-44307
|
Porter County |
CR 300 South over Ludington Ditch in Porter township |
Bridge
|
$1,736,931 |
Local Bridge |
2003041 |
|
Porter County |
Porter County Bridge 64-00066 - CR 250 W over Phillips Ditch |
Bridge
|
$2,004,125 |
Local Bridge |
1902813 |
B-42830
|
Porter County |
Bridge Replacement; 300W over Cornell Ditch |
Bridge
|
$1,850,000 |
Local Bridge |
1902812 |
B-42831
|
Porter County |
Bridge Replacement; Lenburg over Salt Creek |
Bridge
|
$2,730,000 |
Local Bridge |
1902811 |
B-42832
|
Porter County |
Bridge Replacement; 600N over Salt Creek |
Bridge
|
$2,295,000 |
Local Bridge |
1902810 |
|
Porter County |
Bridge Replacement 500E over Crooked Creek |
Bridge
|
$1,675,000 |
Local Bridge |
2201289 |
|
Porter County |
Countywide Bridge Inspection |
Bridge
|
$481,724 |
Local Bridge |
2100109 |
|
Porter County |
Countywide Bridge Inspection |
Bridge
|
$422,774 |
Local Bridge |
1802932 |
B-42063
|
Porter County |
Bridge Replacement |
Bridge
|
$3,170,000 |
Local Bridge |
1902001 |
|
Porter County |
Willowcreek Rd Extension SR 130 to 700 N |
Road
|
$10,175,590 |
STBG Chicago UZA |
2300961 |
R-45007
|
Porter County |
Bridge Replacement; #99 |
Bridge
|
$2,684,069 |
STBG Chicago UZA |
1401029 |
R-37669
|
Porter County |
Intersec. Improvement at CR 100S |
Intersection
|
$7,761,200 |
STBG Chicago UZA STBG Group IV |
1500419 |
R-39011
|
Porter County |
Multi-use paths / Bicycle & Pedestrian Facilities |
Bike/Ped
|
$2,375,000 |
TAP Chicago UZA |
2301188 |
|
Porter County |
Willowcreek Road Extension, Phase 2 |
Bridge
|
$15,367,090 |
|
2401578 |
|
Porter County |
Signing for Various County roads in Porter County |
Sign
|
$1,397,530 |
|
1902000 |
R-42412
|
Schererville |
Roadway Expansion Kennedy Ave (Phase 3) |
Road
|
$11,788,883 |
STBG Chicago UZA |
1173760 |
R-36259
|
Schererville |
Quality of Place / New Road Kennedy Ave (Phase 4) |
Road
|
$17,396,664 |
STBG Chicago UZA |
1382603 |
R-35981
|
Schererville |
Quality of Place / Added Travel Lanes- Kennedy Ave (Phase 2) |
Road
|
$13,930,394 |
STBG Chicago UZA |
NIR-25-015 |
|
SLCCS |
Operating Assistance |
Transit
|
$951,185 |
FTA 5307 Chicago UZA |
NIR-25-016 |
|
SLCCS |
Maintain Fleet of Vehicles |
Transit
|
$266,930 |
FTA 5307 Chicago UZA |
NIR-24-014 |
|
SLCCS |
Transit/Asset Management / 2021 Preventative Maint. |
Transit
|
$126,378 |
FTA 5307 Chicago UZA |
NIR-24-016 |
|
SLCCS |
Transit/Expansion / 2024 Operations Expansion |
Transit
|
$167,600 |
FTA 5307 Chicago UZA |
NIR-24-015 |
|
SLCCS |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$340,340 |
FTA 5307 Chicago UZA |
NIR-25-014 |
|
SLCCS |
Operating Assistance for Enhanced Mobility |
Transit
|
$1,001,576 |
FTA 5310 Chicago UZA |
NIR-24-013 |
|
SLCCS |
Transit/Expansion / 2024 Operations Expansion |
Transit
|
$25,000 |
FTA 5310 Chicago UZA |
|