##810##
810 transportation project(s)
|
|
|
1601147 |
R-39625
|
Burns Harbor |
Multi-use Trail Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$809,176 |
CMAQ Chicago UZA |
2101110 |
R-43999
|
Cedar Lake |
Complete Streets sidewalks on 133rd and Morris-FUTURE PROJECT |
Bike/Ped
|
$2,326,625 |
CMAQ Chicago UZA STBG Chicago UZA TAP Chicago UZA |
2000023 |
|
Cedar Lake |
Intersection Improvement 133rd Ave & King Dr |
Signal
|
$689,593 |
HSIP Chicago UZA |
2101117 |
|
Chesterton |
Installation of EVP devises on traffic signals-FUTURE PROJECT |
Signal
|
$2,033,730 |
HSIP Chicago UZA |
1902832 |
|
Chesterton |
Multi-use paths / Westchester-Liberty Phase 3-FUTURE PROJECT |
Other
|
$1,942,000 |
TAP Chicago UZA |
1500323 |
|
Crown Point |
Other Intersection Improvement at US 231 |
Intersection
|
$803,844 |
HSIP Chicago UZA |
1601157 |
|
Crown Point |
Roadway Improvement Program / 109th Ave, Delaware Pkwy to SR 53, includes median construction |
Road Recons/Rehab/Resurf
|
$2,468,169 |
HSIP Chicago UZA |
1601158 |
|
Crown Point |
Roadway Improvement Program / Intersection Improvements (Roundabout) at 109th Ave at Iowa St. |
Intersection
|
$2,853,575 |
HSIP Chicago UZA |
1901948 |
R-43177
|
Crown Point |
Intersection Improvement-Roundabout US 231 & 113th-FUTURE PROJECT |
Intersection
|
$1,623,910 |
STBG Chicago UZA |
NP_INDU_5215 |
|
DNR |
Safety Improvements (Project ID # NP_INDU_5215) |
Road
|
$1,200,000 |
FLTP |
NP_INDU_0945 |
|
DNR |
Pedestrian Bridge replacement (Project ID # NP_INDU_0945) |
Bike/Ped
|
$1,000,000 |
FLTP |
1702276 |
|
DNR |
Rec. Trails Program |
Bike/Ped
|
$456,000 |
Rec Trails Program |
1801757 |
|
DNR |
Marquette Greenway Trail connector |
Bike/Ped
|
$335,000 |
Rec Trails Program |
NIRPC1600428 |
|
E C Transit |
Transit/Asset Management / 2021 Vehicle Replacement |
Transit
|
$462,145 |
FTA 5307 Chicago UZA |
NIRPC1600227 |
|
E C Transit |
Transit/Operating / 2023 Comp Paratransit |
Transit
|
$367,149 |
FTA 5307 Chicago UZA |
NIRPC1600244 |
|
E C Transit |
Transit/Operating / 2021 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
NIRPC1600226 |
|
E C Transit |
Transit/Operating / 2024 Comp Paratransit-FUTURE PROJECT |
Transit
|
$378,164 |
FTA 5307 Chicago UZA |
1901792.OP.CP.01.01 |
|
E C Transit |
Transit/Operating / 2020 Comp Paratransit |
Transit
|
$460,993 |
FTA 5307 Chicago UZA |
NIRPC1600356 |
|
E C Transit |
Transit/Asset Management / 2021 Preventative Maint. |
Transit
|
$250,000 |
FTA 5307 Chicago UZA |
NIRPC1600246 |
|
E C Transit |
Transit/Operating / 2023 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
1901792.AM.PM.01.01 |
|
E C Transit |
Transit/Asset Management / 2020 Preventative Maint. |
Transit
|
$2 |
FTA 5307 Chicago UZA |
NIRPC1600357 |
|
E C Transit |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$250,000 |
FTA 5307 Chicago UZA |
NIRPC1600247 |
|
E C Transit |
Transit/Operating / 2024 Operating Assistance-FUTURE PROJECT |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
1901792.OP.OA.01.01 |
|
E C Transit |
Transit/Operating / 2020 Operating Assistance |
Transit
|
$784,060 |
FTA 5307 Chicago UZA |
NIRPC1600230 |
|
E C Transit |
Transit/Operating / 2022 Comp Paratransit |
Transit
|
$356,455 |
FTA 5307 Chicago UZA |
NIRPC1600359 |
|
E C Transit |
Transit/Asset Management / 2024 Preventative Maint.-FUTURE PROJECT |
Transit
|
$250,000 |
FTA 5307 Chicago UZA |
NIRPC1600229 |
|
E C Transit |
Transit/Operating / 2021 Comp Paratransit |
Transit
|
$346,073 |
FTA 5307 Chicago UZA |
NIRPC1600245 |
|
E C Transit |
Transit/Operating / 2022 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
NIRPC1600358 |
|
E C Transit |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$250,000 |
FTA 5339 Chicago UZA |
1601146 |
|
East Chicago |
Multi-use Trails Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$1,344,800 |
CMAQ Chicago UZA |
0900064 |
R-33678
|
East Chicago |
Road Rehab |
Road Recons/Rehab/Resurf
|
$5,811,368 |
DEMO |
2101118 |
R-44001
|
East Chicago |
Michigan Ave Reconstruction-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$5,030,258 |
STBG Chicago UZA |
0901321 |
|
East Chicago |
Intersection Improvement at ST1001-DELETED |
Intersection
|
$ |
|
1902830 |
|
Gary |
Signal Modernization 5th Ave & Bigger St. |
Signal
|
$460,626 |
STBG Chicago UZA |
1702158 |
|
Gary |
Multi-use Trail Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$1,862,252 |
STBG Chicago UZA |
1802973 |
R-42183
|
Gary |
Roadway Improvement Program / Road Reconstruction (3R/4R Standards) at 15th Ave-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$4,235,870 |
STBG Chicago UZA |
1801738 |
|
Gary |
Complete Streets Program / Complete streets enhancements in conjunction with road reconstruction on US 12/20 and Lake Street; |
Road Recons/Rehab/Resurf
|
$4,566,764 |
STBG Chicago UZA |
1600418 |
|
Gary |
Road Rehab (3R/4R Standards) at Airport Rd; Phase 1 |
Road Recons/Rehab/Resurf
|
$3,586,350 |
STBG Chicago UZA |
1802975 |
R-42184
|
Gary |
Road Rehabilitation (3R/4R) Airport Rd Phase 2 |
Road Recons/Rehab/Resurf
|
$896,000 |
STBG Chicago UZA |
NIRPC2600420 |
|
Gary |
5th Ave On Road Trail |
Road
|
$6,125,000 |
TAP Chicago UZA |
NIRPC1600237 |
|
GPTC |
Transit/Operating / 2021 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIRPC1600238 |
|
GPTC |
Transit/Operating / 2022 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIRPC1600409 |
|
GPTC |
Planning / 2024 Planning-FUTURE PROJECT |
Transit
|
$121,551 |
FTA 5307 Chicago UZA |
1901792.OP.OA.02.01 |
|
GPTC |
Transit/Operating / 2020 Operating Assistance |
Transit
|
$476,934 |
FTA 5307 Chicago UZA |
NIRPC1600223 |
|
GPTC |
Transit/Operating / 2022 Comp Paratransit |
Transit
|
$883,378 |
FTA 5307 Chicago UZA |
1901792 |
|
GPTC |
Planning / 2020 TOD Planning |
Transit
|
$100,000 |
FTA 5307 Chicago UZA |
NIRPC1600416 |
|
GPTC |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$287,500 |
FTA 5307 Chicago UZA |
1382989 |
|
GPTC |
GPTC Service Planning |
Transit
|
$100,000 |
FTA 5307 Chicago UZA |
1592019 |
|
GPTC |
GPTC Comp. Paratransit |
Transit
|
$801,250 |
FTA 5307 Chicago UZA |
NIRPC1600408 |
|
GPTC |
Planning / 2022 Planning |
Transit
|
$297,750 |
FTA 5307 Chicago UZA |
NIRPC1600343 |
|
GPTC |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
NIRPC1600375 |
|
GPTC |
Transit/Customer Exp. / 2022 Trans. Facilities |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIRPC1600224 |
|
GPTC |
Transit/Operating / 2023 Comp Paratransit |
Transit
|
$927,548 |
FTA 5307 Chicago UZA |
NIRPC1600407 |
|
GPTC |
Planning / 2021 Planning |
Transit
|
$105,000 |
FTA 5307 Chicago UZA |
NIRPC1600233 |
|
GPTC |
Transit/Operating / 2022 Operating Assistance |
Transit
|
$877,294 |
FTA 5307 Chicago UZA |
NIRPC1600342 |
|
GPTC |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
1382987 |
|
GPTC |
GPTC Comp. Paratransit |
Transit
|
$801,250 |
FTA 5307 Chicago UZA |
NIRPC1600222 |
|
GPTC |
Transit/Operating / 2021 Comp Paratransit |
Transit
|
$841,313 |
FTA 5307 Chicago UZA |
NIRPC1600341 |
|
GPTC |
Transit/Asset Management / 2021 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
NIRPC1600239 |
|
GPTC |
Transit/Operating / 2023 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
1902792.PLN.TP.02.01 |
|
GPTC |
Planning / 2020 Planning |
Transit
|
$100,000 |
FTA 5307 Chicago UZA |
NIRPC1600344 |
|
GPTC |
Transit/Asset Management / 2024 Preventative Maint.-FUTURE PROJECT |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
1592086 |
|
GPTC |
GPTC Service Planning |
Transit
|
$100,000 |
FTA 5307 Chicago UZA |
NIRPC1600232 |
|
GPTC |
Transit/Operating / 2021 Operating Assistance |
Transit
|
$477,294 |
FTA 5307 Chicago UZA |
NIRPC2600478 |
|
GPTC |
Planning / 2023 Planning |
Transit
|
$115,763 |
FTA 5307 Chicago UZA |
NIRPC1600234 |
|
GPTC |
Transit/Operating / 2023 Operating Assistance |
Transit
|
$1,277,294 |
FTA 5307 Chicago UZA |
NIRPC1600417 |
|
GPTC |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$70,000 |
FTA 5307 Chicago UZA |
1901792.CX.PF.02.01 |
|
GPTC |
Transit/Customer Exp. / 2020 Trans. Facilities |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIRPC1600225 |
|
GPTC |
Transit/Operating / 2024 Comp Paratransit-FUTURE PROJECT |
Transit
|
$973,925 |
FTA 5307 Chicago UZA |
1901792.AM.PM.02.01 |
|
GPTC |
Transit/Asset Management / 2020 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
1901792.OP.CP.02.01 |
|
GPTC |
Transit/Operating / 2020 Comp Paratransit |
Transit
|
$801,250 |
FTA 5307 Chicago UZA |
NIRPC1600240 |
|
GPTC |
Transit/Operating / 2024 JARC-FUTURE PROJECT |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
1901792.CX.PE.02.01 |
|
GPTC |
Transit/Customer Exp. / 2020 Metro Ped Facilities |
Transit
|
$900,000 |
FTA 5307 Chicago UZA |
1901792.OP.JC.02.01 |
|
GPTC |
Transit/Operating / 2020 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIRPC1600376 |
|
GPTC |
Transit/Customer Exp. / 2024 Trans. Facilities-FUTURE PROJECT |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIRPC1600235 |
|
GPTC |
Transit/Operating / 2024 Operating Assistance-FUTURE PROJECT |
Transit
|
$1,552,558 |
FTA 5307 Chicago UZA |
NIRPC1600374 |
|
GPTC |
Transit/Customer Exp. / 2021 Metro Trans. Facilities |
Transit
|
$100,000 |
FTA 5307 Chicago UZA |
1592090 |
|
GPTC |
GPTC Replace #7004-7006 |
Transit
|
$3,502,500 |
FTA 5307 Chicago UZA STBG Chicago Transfer to FTA |
1901792.AM.MF.02.01 |
|
GPTC |
Transit/Asset management / 2020 Transit Maint. Facility |
Transit
|
$1,750,000 |
FTA 5339 Chicago UZA |
1901792.AM.VR.02.01 |
|
GPTC |
Transit/Asset Management / 2020 Vehicle Replacement |
Transit
|
$287,500 |
FTA 5339 Chicago UZA |
NIRPC1600446 |
|
GPTC |
Transit/Asset Management / 2024 Vehicle Replacement-FUTURE PROJECT |
Transit
|
$1,350,000 |
FTA 5339 Chicago UZA |
1401230 |
|
GPTC |
Transit Facilities Improvements to Driver Relief Facility |
Transit
|
$2,431,250 |
FTA 5339 Chicago UZA |
NIRPC1600415 |
|
GPTC |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$1,350,000 |
FTA 5339 Chicago UZA |
NIRPC1600419 |
|
GPTC |
Transit/Asset Management / 2021 Vehicle Replacement |
Transit
|
$70,000 |
FTA 5339 Chicago UZA |
2101119 |
R-44002
|
Griffith |
Roundabout at Broad St and Ave H-FUTURE PROJECT |
Intersection
|
$2,110,831 |
STBG Chicago UZA |
1601145 |
|
Hammond |
Multi-use Trail Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$400,000 |
CMAQ Chicago UZA |
1901784 |
|
Hammond |
Intersection Improvement; Hammond - Michigan St (US 20) at Indianapolis Blvd (SR 152) |
Intersection
|
$439,850 |
CMAQ Chicago UZA |
1500221 |
|
Hammond |
Quality of Place Program / Added Travel Lanes at Chicago Ave |
Road
|
$13,398,274 |
DEMO STBG Chicago UZA |
1297017 |
|
Hammond |
Chicago Street Reconstruction |
Road Recons/Rehab/Resurf
|
$15,603,798 |
DEMO STBG Chicago UZA |
2101127 |
R-44003
|
Hammond |
Summer St Reconstruction |
Road Recons/Rehab/Resurf
|
$4,337,754 |
Federal Special |
1601163 |
|
Hammond |
Pedestrian Island Construction at 173rd Ave |
Other
|
$1,590,627 |
HSIP Chicago UZA |
2101128 |
R-44060
|
Hammond |
Trail on Michigan St bridge over Kennedy-FUTURE PROJECT |
Bridge
|
$900,393 |
STBG Chicago UZA |
1901902 |
|
Hammond |
Pavement Rehabilitation; complete Streets-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$4,508,000 |
STBG Chicago UZA |
1902700 |
|
Hammond |
Pavement Rehabilitation - Summer St |
Road Recons/Rehab/Resurf
|
$7,560,000 |
STBG Chicago UZA |
2002586 |
|
Hammond |
Hohman Complete Streets-FUTURE PROJECT |
Road Op & Maint
|
$2,884,000 |
STBG Chicago UZA |
1500222 |
|
Hammond |
Quality of place / Added Travel Lanes- Chicago Ave |
Road
|
$6,241,500 |
STBG Chicago UZA |
1901904 |
|
Hammond |
Stormwater Improvements on Nevada St-DELETED |
Other
|
$0 |
TAP Chicago UZA |
1901900 |
R-42311
|
Hammond |
Multi-use paths / Hammond Marquette Greenway-FUTURE PROJECT |
Other
|
$2,469,740 |
TAP Chicago UZA |
1382659 |
|
Hammond |
Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$691,896 |
TAP Chicago UZA |
##481##
481 transportation project(s)
|
|
|
1601147 |
R-39625
|
Burns Harbor |
Multi-use Trail Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$809,176 |
CMAQ Chicago UZA |
1601149 |
|
Cedar Lake |
E85 fuel |
Other
|
$50,000 |
CMAQ Chicago UZA |
2101110 |
|
Cedar Lake |
Complete Streets sidewalks on 133rd and Morris |
Bike/Ped
|
$2,326,625 |
CMAQ Chicago UZA STBG Chicago UZA TAP Chicago UZA |
2101117 |
|
Chesterton |
Installation of EVP devises on traffic signals |
Signal
|
$2,033,730 |
STBG Chicago UZA |
1902832 |
R-42649
|
Chesterton |
Multi-use paths / Westchester-Liberty Phase 3 |
Other
|
$1,750,000 |
TAP Chicago UZA |
1901948 |
R-43177
|
Crown Point |
Intersection Improvement-Roundabout US 231 & 113th |
Intersection
|
$1,473,910 |
STBG Chicago UZA |
NIRPC2700502 |
|
Crown Point |
Veterans Memorial and Pennsey Greenway Trails in Crown Point |
Bike/Ped
|
$2,984,000 |
|
NIR-23-002 |
|
E C Transit |
Transit/Operating / 2023 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
NIR-24-003 |
|
E C Transit |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$250,000 |
FTA 5307 Chicago UZA |
NIR-22-003 |
|
E C Transit |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$250,000 |
FTA 5307 Chicago UZA |
NIR-25-001 |
|
E C Transit |
Complementary paratransit service |
Transit
|
$738,858 |
FTA 5307 Chicago UZA |
NIR-24-001 |
|
E C Transit |
Transit/Operating / 2024 Comp Paratransit |
Transit
|
$378,164 |
FTA 5307 Chicago UZA |
NIR-23-001 |
|
E C Transit |
Transit/Operating / 2023 Comp Paratransit |
Transit
|
$367,149 |
FTA 5307 Chicago UZA |
NIR-22-001 |
|
E C Transit |
Transit/Operating / 2022 Comp Paratransit |
Transit
|
$356,455 |
FTA 5307 Chicago UZA |
NIR-22-002 |
|
E C Transit |
Transit/Operating / 2022 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
NIR-25-003 |
|
E C Transit |
Transit Asset Management/2025-2026 Preventative Maintenance |
Transit
|
$500,000 |
FTA 5307 Chicago UZA |
NIR-24-002 |
|
E C Transit |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$384,060 |
FTA 5307 Chicago UZA |
NIR-25-002 |
|
E C Transit |
Maintain Existing Route Service |
Transit
|
$884,060 |
FTA 5307 Chicago UZA |
NIR-23-003 |
|
E C Transit |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$250,000 |
FTA 5339 Chicago UZA |
1601146 |
R-39624
|
East Chicago |
Multi-use Trails Program / Bike/Pedestrian Facilities at Marquette Trail |
Bike/Ped
|
$1,344,800 |
CMAQ Chicago UZA |
0900064 |
R-33678
|
East Chicago |
Road Rehab |
Road Recons/Rehab/Resurf
|
$5,811,368 |
DEMO |
2101118 |
|
East Chicago |
Michigan Ave Reconstruction-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$4,490,258 |
STBG Chicago UZA |
1902830 |
R-42650
|
Gary |
Signal Modernization 5th Ave & Bigger St. |
Signal
|
$460,626 |
STBG Chicago UZA |
1802973 |
R-42183
|
Gary |
Roadway Improvement Program / Road Reconstruction (3R/4R Standards) at 15th Ave |
Road Recons/Rehab/Resurf
|
$3,995,000 |
STBG Chicago UZA |
1802975 |
R-42184
|
Gary |
Road Rehabilitation (3R/4R) Airport Rd Phase 2 |
Road Recons/Rehab/Resurf
|
$896,000 |
STBG Chicago UZA |
NIRPC2600420 |
|
Gary |
5th Ave On Road Trail |
Road
|
$375,000 |
TAP Chicago UZA |
NIR-25-013 |
|
GPTC |
Transit Expansion - Hobart |
Transit
|
$10 |
CMAQ Chicago UZA |
NIR-25-011 |
|
GPTC |
simulator for driver training |
Transit
|
$370,000 |
FTA 5307 Chicago UZA |
NIR-24-004 |
|
GPTC |
Transit/Customer Exp. / 2024 Trans. Facilities |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIR-22-004 |
|
GPTC |
Transit/Customer Exp. / 2022 Trans. Facilities |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIR-24-007 |
|
GPTC |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$1,552,558 |
FTA 5307 Chicago UZA |
NIR-25-010 |
|
GPTC |
Vehicle replacement |
Transit
|
$5,450,000 |
FTA 5307 Chicago UZA |
NIR-23-009 |
|
GPTC |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$70,000 |
FTA 5307 Chicago UZA |
NIR-23-011 |
|
GPTC |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$287,500 |
FTA 5307 Chicago UZA |
NIR-25-008 |
|
GPTC |
Preventative Maintenance |
Transit
|
$9,036,906 |
FTA 5307 Chicago UZA |
NIRPC2700538 |
|
GPTC |
vehicle replacement-FUTURE PROJECT |
Transit
|
$105,000 |
FTA 5307 Chicago UZA |
NIR-22-005 |
|
GPTC |
Transit/Operating / 2022 Comp Paratransit |
Transit
|
$883,378 |
FTA 5307 Chicago UZA |
NIR-23-004 |
|
GPTC |
Transit/Operating / 2023 Comp Paratransit |
Transit
|
$927,548 |
FTA 5307 Chicago UZA |
NIR-24-005 |
|
GPTC |
Transit/Operating / 2024 Comp Paratransit |
Transit
|
$973,925 |
FTA 5307 Chicago UZA |
NIR-22-006 |
|
GPTC |
Transit/Operating / 2022 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIR-23-005 |
|
GPTC |
Transit/Operating / 2023 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIR-24-006 |
|
GPTC |
Transit/Operating / 2024 JARC |
Transit
|
$1,451,246 |
FTA 5307 Chicago UZA |
NIR-22-007 |
|
GPTC |
Transit/Operating / 2022 Operating Assistance |
Transit
|
$877,294 |
FTA 5307 Chicago UZA |
NIR-23-006 |
|
GPTC |
Transit/Operating / 2023 Operating Assistance |
Transit
|
$1,277,294 |
FTA 5307 Chicago UZA |
NIR-25-004 |
|
GPTC |
Operating Assistance |
Transit
|
$2,114,762 |
FTA 5307 Chicago UZA |
NIR-25-005 |
|
GPTC |
Operating Assistance |
Transit
|
$2,994,103 |
FTA 5307 Chicago UZA |
NIR-25-006 |
|
GPTC |
Operating Assistance |
Transit
|
$2,235,218 |
FTA 5307 Chicago UZA |
NIR-22-008 |
|
GPTC |
Planning / 2022 Planning |
Transit
|
$297,750 |
FTA 5307 Chicago UZA |
NIR-24-008 |
|
GPTC |
Planning / 2024 Planning |
Transit
|
$121,551 |
FTA 5307 Chicago UZA |
NIR-23-007 |
|
GPTC |
Planning / 2023 Planning |
Transit
|
$115,763 |
FTA 5307 Chicago UZA |
NIR-25-007 |
|
GPTC |
Transit Planning |
Transit
|
$200,000 |
FTA 5307 Chicago UZA |
NIR-22-009 |
|
GPTC |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
NIR-23-008 |
|
GPTC |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
NIR-24-009 |
|
GPTC |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$4,507,185 |
FTA 5307 Chicago UZA |
NIR-24-010 |
|
GPTC |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$1,350,000 |
FTA 5339 Chicago UZA |
NIR-25-009 |
|
GPTC |
Vehicle Replacement |
Transit
|
$192,500 |
FTA 5339 Chicago UZA |
NIR-23-010 |
|
GPTC |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$1,350,000 |
FTA 5339 Chicago UZA |
NIR-25-012 |
|
GPTC |
Station Improvements |
Transit
|
$69,000 |
FTA 5339 Chicago UZA |
2101119 |
R-44002
|
Griffith |
Roundabout at Broad St and Ave H-FUTURE PROJECT |
Intersection
|
$2,520,606 |
STBG Chicago UZA |
1901784 |
R-42309
|
Hammond |
Intersection Improvement; Hammond - Michigan St (US 20) at Indianapolis Blvd (SR 152) |
Intersection
|
$439,850 |
CMAQ Chicago UZA |
1901902 |
R-42312
|
Hammond |
Pavement Rehabilitation; complete Streets |
Road Recons/Rehab/Resurf
|
$4,508,000 |
STBG Chicago UZA |
2002586 |
R-43589
|
Hammond |
Hohman Complete Streets |
Road Op & Maint
|
$2,884,000 |
STBG Chicago UZA |
2101127 |
|
Hammond |
Summer St Reconstruction-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$4,642,229 |
STBG Chicago UZA |
1902700 |
R-42619
|
Hammond |
Pavement Rehabilitation - Summer St |
Road Recons/Rehab/Resurf
|
$7,560,000 |
STBG Chicago UZA |
2101128 |
|
Hammond |
Trail on Michigan St bridge over Kennedy |
Bridge
|
$900,393 |
STBG Chicago UZA |
1901900 |
R-42311
|
Hammond |
Multi-use paths / Hammond Marquette Greenway |
Other
|
$2,469,740 |
TAP Chicago UZA |
2002582 |
|
Highland |
Signal on Erie Lackawanna Trail |
Bike/Ped
|
$350,000 |
HSIP Chicago UZA |
1902707 |
R-42620
|
Hobart |
Roundabout Hobart - 61st Ave & Marcella Dr |
Intersection
|
$5,239,000 |
CMAQ Chicago UZA |
1902708 |
|
Hobart |
Hobart Diesel Vehicles Replacement with CNG |
Other
|
$1,924,833 |
CMAQ Chicago UZA |
1401034 |
|
Hobart |
Roadway Improvement Program / Line of Sight Corrections; Access Management at Colorado St |
Road
|
$4,306,190 |
HSIP Chicago UZA |
1382598 |
|
Hobart |
Roadway Improvement Program / Road Reconstruction (3R/4R Standards) at County Line Rd-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$8,912,250 |
STBG Chicago UZA |
2000419 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,023,952 |
NHPP Interstate |
2000421 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$968,817 |
NHPP Interstate |
2002122 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$982,623 |
NHPP Interstate |
2002123 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$982,623 |
NHPP Interstate |
2002146 |
B-43350
|
INDOT |
Bridge Thin Deck Overlay in Lake County |
Other
|
$1,229,525 |
NHPP Interstate |
2002147 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$1,104,067 |
NHPP Interstate |
2002148 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$1,179,136 |
NHPP Interstate |
1901357 |
R-42491
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$11,441,398 |
NHPP Interstate |
2000495 |
R-43004
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$12,862,285 |
NHPP Interstate |
2000492 |
R-43003
|
INDOT |
District Pavement Project (Interstate) |
Road Recons/Rehab/Resurf
|
$20,879,221 |
NHPP Interstate |
2000497 |
R-43005
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$5,349,500 |
NHPP Interstate |
2000052 |
|
INDOT |
Intersection Improvement Project in Lake County |
Other
|
$1,950,000 |
NHPP Interstate |
1800885 |
|
INDOT |
ITS Maintenance |
ITS
|
$300,000 |
NHPP Interstate |
1901643 |
T-42591
|
INDOT |
ITS Traffic Management |
ITS
|
$35,000,000 |
NHPP Interstate |
1900039 |
|
INDOT |
District Bridge Project |
Other
|
$11,737,312 |
NHPP Interstate |
1900040 |
|
INDOT |
District Bridge Project |
Other
|
$2,214,968 |
NHPP Interstate |
1900041 |
|
INDOT |
District Bridge Project |
Other
|
$2,214,968 |
NHPP Interstate |
1900042 |
|
INDOT |
District Bridge Project |
Other
|
$2,214,968 |
NHPP Interstate |
1900044 |
|
INDOT |
District Bridge Project |
Other
|
$2,073,720 |
NHPP Interstate |
1900045 |
|
INDOT |
District Bridge Project |
Other
|
$2,073,720 |
NHPP Interstate |
2002346 |
B-43364
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Other
|
$2,245,026 |
NHPP Interstate |
1700296 |
|
INDOT |
Bridge Painting at I 94 |
Bridge
|
$6,792,158 |
NHPP Interstate |
1500674 |
|
INDOT |
Bridge Deck Overlay at I 80 |
Bridge
|
$11,422,052 |
NHPP Interstate |
2000778 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,296,820 |
NHPP Interstate |
2000784 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,296,820 |
NHPP Interstate |
2000787 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$767,573 |
NHPP Interstate |
2000777 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,006,181 |
NHPP Interstate |
2002120 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$11,600,309 |
NHPP Interstate |
2002121 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$2,160,108 |
NHPP Interstate |
2002347 |
B-43350
|
INDOT |
District Bridge Project (Rehabilitation) in Lake County |
Bridge
|
$1,852,119 |
NHPP Interstate |
2002344 |
B-43355
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$1,026,466 |
NHPP Interstate |
2000852 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$7,108,662 |
NHPP Interstate |
2001572 |
43290
|
INDOT |
Bridge rehabilitation |
Bridge
|
$300,000 |
NHPP Interstate |
2000425 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$878,199 |
NHPP Interstate |
2000430 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$883,199 |
NHPP Interstate |
2000758 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$4,230,598 |
NHPP Interstate |
2000770 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,141,984 |
NHPP Interstate |
2000772 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,012,350 |
NHPP Interstate |
2000414 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$3,727,349 |
NHPP Interstate |
2000416 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,162,033 |
NHPP Interstate |
1703011 |
|
INDOT |
Bridge Replacement |
Bridge
|
$14,025,188 |
NHPP Interstate NHPP Non Interstate |
2000396 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$622,254 |
NHPP Non Interstate |
2002038 |
B-43332
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$2,604,324 |
NHPP Non Interstate |
2002039 |
B-43332
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$1,221,810 |
NHPP Non Interstate |
2002079 |
B-43337
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$2,568,867 |
NHPP Non Interstate |
2002080 |
B-43337
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Bridge
|
$1,099,986 |
NHPP Non Interstate |
2000398 |
43140
|
INDOT |
Bridge deck Overlay |
Bridge
|
$2,746,630 |
NHPP Non Interstate |
2000051 |
B-42993
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$537,165 |
NHPP Non Interstate |
2000058 |
B-42993
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$179,931 |
NHPP Non Interstate |
2000045 |
B-42991
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$2,045,457 |
NHPP Non Interstate |
2000040 |
B-42991
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$221,034 |
NHPP Non Interstate |
2000042 |
B-42991
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$208,469 |
NHPP Non Interstate |
2000402 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$581,327 |
NHPP Non Interstate |
2000449 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$281,483 |
NHPP Non Interstate |
2000683 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$199,477 |
NHPP Non Interstate |
2000448 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$345,604 |
NHPP Non Interstate |
2000411 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$492,808 |
NHPP Non Interstate |
2001994 |
B-43360
|
INDOT |
District Bridge Project (Rehabilitation) in Porter County |
Other
|
$373,666 |
NHPP Non Interstate |
2000529 |
R-42998
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$14,749,538 |
NHPP Non Interstate |
1900054 |
|
INDOT |
District Pavement Project |
Other
|
$11,206,357 |
NHPP Non Interstate |
1900055 |
|
INDOT |
District Pavement Project |
Other
|
$7,184,677 |
NHPP Non Interstate |
2002312 |
R-43386
|
INDOT |
District Pavement Project (Non-I) in Lake County |
Other
|
$5,909,664 |
NHPP Non Interstate |
1701532 |
R-41201
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$3,852,470 |
NHPP Non Interstate |
2000534 |
R-43008
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$1,144,397 |
NHPP Non Interstate |
2000532 |
R-43007
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$3,079,375 |
NHPP Non Interstate |
2000499 |
R-43006
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$1,935,282 |
NHPP Non Interstate |
2000606 |
R-43026
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$4,362,680 |
NHPP Non Interstate |
2000607 |
R-43027
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$15,429,449 |
NHPP Non Interstate |
2000609 |
R-43028
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$4,568,635 |
NHPP Non Interstate |
2000610 |
R-43029
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$2,256,079 |
NHPP Non Interstate |
2000613 |
R-43030
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$2,338,671 |
NHPP Non Interstate |
2000614 |
R-43031
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$917,510 |
NHPP Non Interstate |
2001884 |
R-43384
|
INDOT |
District Pavement Project (Non-I) in Lake County |
Road Recons/Rehab/Resurf
|
$8,295,000 |
NHPP Non Interstate |
1701521 |
|
INDOT |
District Pavement Project (Non-I) in Porter County |
Road Recons/Rehab/Resurf
|
$225,677 |
NHPP Non Interstate |
1702988 |
R-43130
|
INDOT |
District Intersection Improvement Project |
Intersection
|
$800,000 |
NHPP Non Interstate |
2000022 |
R-43386
|
INDOT |
District Pavement Project (Non-I) in Lake County |
Intersection
|
$755,000 |
NHPP Non Interstate |
1600693 |
R-42248
|
INDOT |
Added Travel Lanes Project |
Intersection
|
$1,658,058 |
NHPP Non Interstate |
1700022 |
R-42251
|
INDOT |
Intersection Improvement Project |
Intersection
|
$2,959,506 |
NHPP Non Interstate |
1702994 |
R-43388
|
INDOT |
District Intersection Improvement Project in Lake County |
Intersection
|
$3,240,298 |
NHPP Non Interstate |
1900186 |
|
INDOT |
District Pavement Project |
Road Op & Maint
|
$1,173,582 |
NHPP Non Interstate |
2001885 |
R-43382
|
INDOT |
District Pavement Project (Non-I) in LaPorte County |
Road Op & Maint
|
$8,989,637 |
NHPP Non Interstate |
1900037 |
|
INDOT |
District Bridge Project |
Other
|
$1,542,766 |
NHPP Non Interstate |
2001935 |
R-43331
|
INDOT |
District Small Structure Project in Porter County |
Other
|
$355,405 |
NHPP Non Interstate |
2002295 |
R-43351
|
INDOT |
District Small Structure Project in LaPorte County |
Other
|
$265,095 |
NHPP Non Interstate |
1701509 |
R-40606
|
INDOT |
District Small Structure Project |
Bridge
|
$535,871 |
NHPP Non Interstate |
1900020 |
|
INDOT |
District Small Structure Project |
Bridge
|
$441,451 |
NHPP Non Interstate |
2002298 |
R-43358
|
INDOT |
District Small Structure Project in Lake County |
Bridge
|
$1,022,515 |
NHPP Non Interstate |
2002299 |
R-43379
|
INDOT |
District Small Structure Project in LaPorte County |
Bridge
|
$377,666 |
NHPP Non Interstate |
1902136 |
R-42604
|
INDOT |
Small Structure and Drains Construction |
Other
|
$1,554,220 |
NHPP Non Interstate |
2002398 |
R-43390
|
INDOT |
District Small Structure Project in Jasper and Porter Counties |
Other
|
$935,900 |
NHPP Non Interstate |
2002532 |
T-43480
|
INDOT |
Stop Control Warning Systems |
Other
|
$410,000 |
NHPP Non Interstate |
1600701 |
R-42249
|
INDOT |
Intersection Improvement Project |
Other
|
$1,614,518 |
NHPP Non Interstate |
1703012 |
|
INDOT |
Bridge Replacement |
Bridge
|
$1,226,898 |
NHPP Non Interstate |
1703000 |
|
INDOT |
Pedestrian bridge removal |
Bridge
|
$553,921 |
NHPP Non Interstate |
1800067 |
|
INDOT |
Concrete Pavement Restoration |
Road Recons/Rehab/Resurf
|
$27,357,641 |
NHPP Non Interstate |
1702995 |
|
INDOT |
Intersection Improvement with added Turn Lanes |
Intersection
|
$7,756,393 |
NHPP Non Interstate |
1702996 |
|
INDOT |
Intersection Improvement |
Intersection
|
$5,616,225 |
NHPP Non Interstate |
1703005 |
|
INDOT |
Bridge Replacement |
Bridge
|
$3,024,569 |
NHPP Non Interstate |
1703004 |
|
INDOT |
Bridge Replacement |
Bridge
|
$1,404,844 |
NHPP Non Interstate |
1801869 |
|
INDOT |
Intersection Improvement with median U-Turn |
Intersection
|
$1,310,000 |
NHPP Non Interstate |
1801868 |
|
INDOT |
Intersection improvement with added turn lanes |
Intersection
|
$1,360,000 |
NHPP Non Interstate |
1800628 |
|
INDOT |
Bridge Painting |
Bridge
|
$1,521,580 |
NHPP Non Interstate |
1800661 |
|
INDOT |
Small Structure Replacement |
Bridge
|
$836,969 |
NHPP Non Interstate |
1703038 |
|
INDOT |
Small Structure Replacement |
Bridge
|
$427,900 |
NHPP Non Interstate |
1703043 |
|
INDOT |
Bridge Superstructure Replacement |
Bridge
|
$2,921,786 |
NHPP Non Interstate |
1800257 |
|
INDOT |
Bridge Replacement |
Bridge
|
$8,146,380 |
NHPP Non Interstate |
1700025 |
|
INDOT |
Adding center left turn lane-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$11,174,232 |
NHPP Non Interstate |
1702989 |
|
INDOT |
Intersection Improvement; Roundabout |
Intersection
|
$2,485,412 |
NHPP Non Interstate |
2000062 |
R-42998
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$2,419,689 |
NHPP Non Interstate |
2000094 |
R-42998
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,969,245 |
NHPP Non Interstate |
2000095 |
R-42998
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$992,059 |
NHPP Non Interstate |
2000096 |
R-42998
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$856,103 |
NHPP Non Interstate |
2000214 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$534,873 |
NHPP Non Interstate |
2000792 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$444,466 |
NHPP Non Interstate |
2000825 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$2,704,991 |
NHPP Non Interstate |
2000397 |
B-43020
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$660,179 |
NHPP Non Interstate |
2000789 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$295,431 |
NHPP Non Interstate |
2000811 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$374,948 |
NHPP Non Interstate |
2000819 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,503,222 |
NHPP Non Interstate |
2000213 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,396,364 |
NHPP Non Interstate |
1900489 |
|
INDOT |
Railroad crossing project |
Rail
|
$380,000 |
Rail/Hwy Xings Sec 130 |
1900485 |
|
INDOT |
RR Crossing Improvements / Modernizations |
Intersection
|
$1,260,000 |
Rail/Hwy Xings Sec 130 |
1701446 |
40601
|
INDOT |
Bridge Replacement |
Bridge
|
$2,520,313 |
|
1703001 |
|
INDOT |
Bridge Replacement |
Bridge
|
$1,799,732 |
|
1701523 |
42550
|
INDOT |
SR 2 paving project in Lowell |
Road Recons/Rehab/Resurf
|
$3,809,434 |
|
1600500 |
|
INDOT |
Replace Superstructure at SR 249 |
Other
|
$26,378,760 |
|
1801376 |
|
INDOT |
Intersection Improvement |
Intersection
|
$3,700,023 |
|
1703009 |
|
INDOT |
Bridge Replacement |
Bridge
|
$931,767 |
|
1296364 |
|
INDOT |
Bridge Painting at SR 49 |
Bridge
|
$3,049,812 |
|
1800865 |
|
INDOT |
ITS devices replacement and maintenance |
ITS
|
$600,000 |
|
1700106 |
40598
|
INDOT |
Replace superstructure |
Other
|
$5,671,546 |
|
1602110 |
|
INDOT |
HMA Overlay, Preventive Maintenance at US 20 |
Road Recons/Rehab/Resurf
|
$1,527,017 |
|
1702993 |
|
INDOT |
Auxililary Lanes, Two Way Left Turn Lanes |
Road Recons/Rehab/Resurf
|
$15,937,504 |
|
1702992 |
|
INDOT |
Auxiliary Lanes, Two Way Left Turn Lanes |
Road Recons/Rehab/Resurf
|
$8,310,311 |
|
1500090 |
|
INDOT |
Intersect. Improv. W/ Added Turn Lanes at US 12 |
Intersection
|
$1,831,068 |
|
1383615 |
|
INDOT |
Intersection Improvement, Roundabout at SR 55 |
Intersection
|
$3,004,741 |
|
1703002 |
|
INDOT |
Bridge Replacement |
Bridge
|
$831,554 |
|
1801907 |
|
INDOT |
Bridge over Norfolk Southern |
Bridge
|
$10,668,000 |
|
1800861 |
41755
|
INDOT |
ITS Maintenance Contract |
Intersection
|
$1,846,515 |
|
1801906 |
|
INDOT |
Colorado Street bridge over RR crossing |
Bridge
|
$6,279,140 |
|
1801911 |
B-41850
|
INDOT |
Bridge over Canadian National(LocalTraxx)(Schererville)(Phase 1) |
Bridge
|
$9,870,150 |
|
1900834 |
B-41850
|
INDOT |
Bridge over Canadian National(Local Traxx)(Schererville)(Ph 1) |
Bridge
|
$14,273,247 |
|
2000998 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$130,000 |
|
1900049 |
|
INDOT |
Intersection Improvement Project |
Road Recons/Rehab/Resurf
|
$9,364,237 |
|
1901389 |
B-42500
|
INDOT |
District Bridge Project (Rehabilitation |
Bridge
|
$3,492,293 |
|
1901382 |
B-42499
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$3,338,301 |
|
1901379 |
B-42498
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$10,612,907 |
|
1901377 |
B-42497
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,479,143 |
|
2000082 |
B-41440
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,154,669 |
|
2000039 |
R-41441
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,925,832 |
|
2000074 |
B-41429
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$374,005 |
|
1901401 |
B-42502
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$1,108,000 |
|
2001039 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Bridge
|
$195,200 |
|
1900009 |
|
INDOT |
District Bridge Project |
Bridge
|
$4,589,364 |
|
1900012 |
|
INDOT |
District Bridge Project |
Bridge
|
$4,287,589 |
|
1901468 |
B-42508
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,983,736 |
|
2001042 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Other
|
$1,219,000 |
|
2000138 |
B-41438
|
INDOT |
District Bridge Project (Replacement) |
Other
|
$168,195 |
|
1901361 |
R-42494
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$7,942,441 |
|
1900057 |
|
INDOT |
District Pavement Project (Non-I) |
Other
|
$9,567,066 |
|
1901365 |
R-42219
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$7,675,016 |
|
1901364 |
RS-42495
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$2,614,563 |
|
1901358 |
RS-42492
|
INDOT |
District Pavement Project (Non-I) |
Road Recons/Rehab/Resurf
|
$1,970,434 |
|
1700021 |
R-42250
|
INDOT |
Added Travel Lanes Project |
Intersection
|
$1,483,882 |
|
1800881 |
|
INDOT |
ITS maintenance |
ITS
|
$200,000 |
|
2002572 |
T-43520
|
INDOT |
Traffic Management System Project |
ITS
|
$1,180,000 |
|
1900833 |
|
INDOT |
Bridge over Norfolk Southern Local TRAXX |
Bridge
|
$4,306,196 |
|
1900832 |
B-41853
|
INDOT |
Local Trax, New Bridge Construction |
Bridge
|
$2,604,015 |
|
1802826 |
|
INDOT |
Statewide on-call consultant contract |
Other
|
$8,400,000 |
|
1592882 |
|
INDOT |
District Small Structure Project |
Other
|
$15,000,000 |
|
1900830 |
|
INDOT |
N Clark Rd Local Traxx |
Intersection
|
$22,436,060 |
|
2002529 |
T-43483
|
INDOT |
Raised Pavement Markings, Refurbished |
Road Recons/Rehab/Resurf
|
$680,000 |
|
2001051 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Road Recons/Rehab/Resurf
|
$106,200 |
|
1700087 |
B-42244
|
INDOT |
District Bridge Project (Replacement) |
Other
|
$3,998,340 |
|
1900031 |
|
INDOT |
District Bridge Project |
Other
|
$2,625,532 |
|
1900036 |
|
INDOT |
District Bridge Project |
Other
|
$2,900,532 |
|
1700097 |
B-42244
|
INDOT |
District Bridge Project (Replacement) |
Other
|
$1,045,652 |
|
1700094 |
B-42244
|
INDOT |
District Bridge Project (Replacement) |
Other
|
$1,045,652 |
|
1700088 |
B-42244
|
INDOT |
District Bridge Project (Replacement) |
Other
|
$1,011,392 |
|
1902735 |
|
INDOT |
Welcome Center Renovation |
Other
|
$23,031,615 |
|
1601089 |
|
INDOT |
Shoulder rehabilitation |
Other
|
$9,953,431 |
|
1900446 |
|
INDOT |
District Bridge Project |
Other
|
$760,223 |
|
2001045 |
|
INDOT |
District Small Structure Project |
Other
|
$141,600 |
|
1900028 |
|
INDOT |
District Small Structure Project |
Bridge
|
$1,272,053 |
|
1900029 |
|
INDOT |
District Small Structure Project |
Bridge
|
$709,586 |
|
1900016 |
|
INDOT |
District Small Structure Project |
Bridge
|
$1,081,368 |
|
1900019 |
|
INDOT |
District Small Structure Project |
Bridge
|
$486,781 |
|
1902137 |
R-42605
|
INDOT |
Small Structure and Drains Construction |
Other
|
$1,850,200 |
|
2000995 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Road Recons/Rehab/Resurf
|
$100,300 |
|
2001036 |
|
INDOT |
District Bridge Project (Rehabilitation) |
Road Recons/Rehab/Resurf
|
$77,000 |
|
2002531 |
T-43481
|
INDOT |
Traffic Signal Visibility Improvements |
Signal
|
$710,000 |
|
2001808 |
T-43258
|
INDOT |
Traffic Signals Modernization |
Signal
|
$2,456,500 |
|
2100030 |
R-43130
|
INDOT |
FY24 Traffic Signal Modernization |
Signal
|
$145,000 |
|
2002534 |
T-43484
|
INDOT |
District Traffic Project - Access Management |
Other
|
$340,000 |
|
1900835 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$3,685,955 |
|
1801912 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$7,184,832 |
|
2002545 |
|
INDOT |
New Bridge Tipton / Park Street over RR crossing. |
Bridge
|
$655,500 |
|
1900050 |
|
INDOT |
Intersection Improvement Project |
Road Recons/Rehab/Resurf
|
$5,727,227 |
|
2101143 |
|
La Porte |
EVP installation |
Signal
|
$319,400 |
STBG Chicago UZA |
2101142 |
|
La Porte |
North South Corridor |
Road
|
$1,156,653 |
STBG Chicago UZA |
1902006 |
|
La Porte |
Pavement Resurface/ Rehabilitation throughout the city-2023 |
Road Op & Maint
|
$146,250 |
STBG Mich City UZA |
1902002 |
|
La Porte |
Pavement Rehabilitation 3R/4R Park St |
Road Recons/Rehab/Resurf
|
$1,103,500 |
STBG Mich City UZA |
1601867 |
R-40736
|
La Porte |
Bicycle & Pedestrian Facilities at Chessie Trail II |
Other
|
$1,825,000 |
STBG Mich City UZA |
1700760 |
R-40741
|
La Porte |
Road Preventive Maintenance |
Other
|
$500,000 |
STBG Mich City UZA |
1902008 |
R-42421
|
La Porte |
Pavement Resurface/ Rehabilitation throughout the city |
Road Op & Maint
|
$312,500 |
STBG Mich City UZA |
1902005 |
|
La Porte |
Sidewalk repair/rehab/construction throughout city-2023 |
Bike/Ped
|
$125,000 |
TAP Mich City UZA |
1900831 |
R-43176
|
La Porte |
Chessie Trail 2 RR crossing |
Bike/Ped
|
$412,500 |
TAP Mich City UZA |
1902007 |
R-42420
|
La Porte |
Sidewalk repair/rehab/construction throughout city-2024 |
Bike/Ped
|
$125,000 |
TAP Mich City UZA |
9980080 |
R-31949
|
Lake County |
Added Travel Lanes at 45th Ave |
Road
|
$12,078,928 |
DEMO STBG Chicago UZA |
2101129 |
|
Lake County |
Bridge Replacement Colorado St over Deep River-FUTURE PROJECT |
Bridge
|
$1,960,693 |
Federal Special STBG Chicago UZA |
1902675 |
R-42598
|
Lake County |
Veteran's Memorial Trail (P1) |
Bike/Ped
|
$1,342,754 |
STBG Chicago UZA |
1902676 |
B-42599
|
Lake County |
Veteran's Memorial Parkway Trail Bridge |
Bridge
|
$2,319,010 |
STBG Chicago UZA |
1902819 |
B-42829
|
Lake County |
Bridge #45 Bridge Replacement |
Bridge
|
$5,770,550 |
|
1702830 |
B-41174
|
Lake County |
Lake County Bridge |
Bridge
|
$1,768,100 |
|
1702831 |
B-41175
|
Lake County |
Lake County Bridge |
Bridge
|
$1,765,000 |
|
1173429 |
R-34495
|
Lake Station |
Road reconstruction Central Ave & Fairview-FUTURE PROJECT |
Road Recons/Rehab/Resurf
|
$1,156,176 |
STBG Chicago UZA |
1401027 |
B-37667
|
LaPorte County |
Bridge Replacement at Ottis Rd, Bridge Replacement, Other Construction at Otis Rd |
Other
|
$1,435,630 |
DEMO |
1801831 |
R-41660
|
LaPorte County |
Lincoln Trail Extension |
Other
|
$2,836,568 |
DEMO STBG Mich City UZA |
1902197 |
T-43170
|
LaPorte County |
Highway signs replacement/update |
Sign
|
$192,250 |
HSIP Mich City UZA |
1592335 |
R-38992
|
LaPorte County |
Bicycle & Pedestrian Facilities at Marquette /Singing Sands Trail (LPCO) |
Other
|
$1,458,572 |
STBG Group III STBG Mich City UZA |
1902818 |
R-42836
|
LaPorte County |
Unincorporated Union Mills- Sidewalks and ramps |
Bike/Ped
|
$696,750 |
STBG Group IV |
1702829 |
R-41173
|
LaPorte County |
Intersection Improvement |
Intersection
|
$1,147,129 |
|
1902815 |
B-42837
|
LaPorte County |
00.60 S CR 1300 S Bridge Replacement |
Bridge
|
$1,000,000 |
|
1902029 |
|
LaPorte County |
Bridge Inspection FY 21-24 |
Bridge
|
$405,809 |
|
1702833 |
B-41177
|
LaPorte County |
Bridge #186 |
Bridge
|
$2,385,000 |
|
1802924 |
R-42064
|
Lowell |
ADA ramps & sidewalk installation/repair |
Bike/Ped
|
$2,902,298 |
STBG Group III |
1802920 |
R-42065
|
Lowell |
Freedom Trail |
Bike/Ped
|
$2,165,100 |
|
NIR-25-017 |
|
MC Transit |
Operating Assistance |
Transit
|
$2,925,472 |
FTA 5307 Mich City UZA |
NIR-23-017 |
|
MC Transit |
Transit / Operating Assistance / 2023 |
Transit
|
$1,575,000 |
FTA 5307 Mich City UZA |
NIR-22-015 |
|
MC Transit |
Transit / Operating Assistance / 2022 |
Transit
|
$1,575,000 |
FTA 5307 Mich City UZA |
NIR-24-017 |
|
MC Transit |
Transit / Operating Assistance / 2024 |
Transit
|
$1,625,026 |
FTA 5307 Mich City UZA |
NIR-24-018 |
|
MC Transit |
Transit / Asset Management / 2024 Vehicle Replacements |
Transit
|
$320,000 |
STBG Mich City Transfer to FTA |
NIR-22-016 |
|
MC Transit |
Transit / Asset Management / 2022 Vehicle Replacements |
Transit
|
$522,500 |
STBG Mich City Transfer to FTA |
NIR-24-019 |
|
MC Transit |
Michigan City Transit vehicle replacement |
Transit
|
$350,000 |
STBG Mich City Transfer to FTA |
2101130 |
R-44109
|
Merrillville |
Roundabout at Mississippi & 69th-FUTURE PROJECT |
Intersection
|
$2,634,245 |
STBG Chicago UZA |
2101131 |
|
Merrillville |
Roundabouts at Mississippi & 79th-FUTURE PROJECT |
Intersection
|
$4,908,911 |
STBG Chicago UZA |
1901949 |
R-42315
|
Merrillville |
Complete Streets / Broadway Sidewalks |
Bike/Ped
|
$915,000 |
TAP Chicago UZA |
1901951 |
R-42316
|
Merrillville |
Sidewalks in Merrill Heights neighborhood |
Bike/Ped
|
$1,335,000 |
TAP Chicago UZA |
1802785 |
R-41795
|
Michigan City |
Singing Sand 1 RR crossing |
Bike/Ped
|
$1,260,000 |
Rail/Hwy Xings Sec 130 STBG Mich City UZA |
1902691 |
R-42613
|
Michigan City |
On Road Trail; Liberty Trail |
Bike/Ped
|
$666,500 |
STBG Mich City UZA |
1902689 |
R-42614
|
Michigan City |
Pavement Rehabilitation or Reconstruction; Barker Ave |
Road Recons/Rehab/Resurf
|
$400,000 |
STBG Mich City UZA |
2101148 |
|
Michigan City |
Singing Sands Trail Phase III-D |
Bike/Ped
|
$136,569 |
TAP Mich City UZA |
2101147 |
|
Michigan City |
Singing Sands trail phase III-A-FUTURE PROJECT |
Bike/Ped
|
$2,458,799 |
TAP Mich City UZA |
2101132 |
|
Munster |
Main St reconstruction |
Road Recons/Rehab/Resurf
|
$6,690,741 |
STBG Chicago UZA |
1173597 |
R-34603
|
Munster |
Bicycle & Pedestrian Facilities at E-L/Pennsy Trail |
Bike/Ped
|
$1,030,100 |
TAP Chicago UZA |
NIR-22-018 |
|
NICTD |
Transit / Security / 2022 Security Equip |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIR-22-028 |
|
NICTD |
Transit/Asset management / 2022 Maintenance Overhaul |
Transit
|
$6,985,923 |
FTA 5307 Chicago UZA |
NIR-25-030 |
|
NICTD |
Maintenance Overhaul |
Transit
|
$15,715,315 |
FTA 5307 Chicago UZA |
NIR-24-031 |
|
NICTD |
Transit/Asset management / 2024 Maintenance Overhaul |
Transit
|
$6,985,923 |
FTA 5307 Chicago UZA |
NIR-23-027 |
|
NICTD |
Transit/Asset management / 2023 Maintenance Overhaul |
Transit
|
$6,985,923 |
FTA 5307 Chicago UZA |
NIR-25-025 |
|
NICTD |
Substation Improvements |
Transit
|
$5,000,000 |
FTA 5337 St of Good Repair |
NIR-25-023 |
|
NICTD |
Signal/Catenary Upgrades |
Transit
|
$3,000,000 |
FTA 5337 St of Good Repair |
NIR-25-029 |
|
NICTD |
Facility Improvements |
Transit
|
$1,000,000 |
FTA 5337 St of Good Repair |
NIR-25-031 |
|
NICTD |
Police cameras |
Transit
|
$100,000 |
FTA 5337 St of Good Repair |
NIRPC2700557 |
|
NICTD |
Bridge rehabilitation/ repairs-FUTURE PROJECT |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIRPC2700558 |
|
NICTD |
Software Replacement/Upgrades-FUTURE PROJECT |
Transit
|
$200,000 |
FTA 5337 St of Good Repair |
NIR-25-024 |
|
NICTD |
Shop Equipment |
Transit
|
$1,900,000 |
FTA 5337 St of Good Repair |
NIR-22-029 |
|
NICTD |
Transit/Asset Management / 2022 Support Vehicles |
Transit
|
$562,700 |
FTA 5337 St of Good Repair |
NIR-23-028 |
|
NICTD |
Transit/Asset Management / 2023 Support Vehicles |
Transit
|
$562,700 |
FTA 5337 St of Good Repair |
NIR-24-032 |
|
NICTD |
Transit/Asset Management / 2024 Support Vehicles |
Transit
|
$562,700 |
FTA 5337 St of Good Repair |
NIR-22-017 |
|
NICTD |
Transit/Asset Management / 2022 Midlife Rebuild |
Transit
|
$400,000 |
FTA 5337 St of Good Repair |
NIR-23-018 |
|
NICTD |
Transit/Asset Management / 2023 Midlife Rebuild |
Transit
|
$1,404,500 |
FTA 5337 St of Good Repair |
NIR-24-026 |
|
NICTD |
Transit/Asset Management / 2024 Midlife Rebuild |
Transit
|
$1,404,500 |
FTA 5337 St of Good Repair |
NIR-22-023 |
|
NICTD |
Transit/Asset Management / 2022 Endlife Rebuild |
Transit
|
$1,004,500 |
FTA 5337 St of Good Repair |
NIR-23-023 |
|
NICTD |
Transit/Asset Management / 2023 Endlife Rebuild |
Transit
|
$5,695,500 |
FTA 5337 St of Good Repair |
NIR-24-027 |
|
NICTD |
Transit/Asset Management / 2024 Endlife Rebuild |
Transit
|
$5,695,500 |
FTA 5337 St of Good Repair |
NIR-22-024 |
|
NICTD |
Transit/Asset management / 2022 Rolling Stock |
Transit
|
$8,000,000 |
FTA 5337 St of Good Repair |
NIR-23-024 |
|
NICTD |
Transit/Asset management / 2023 Rolling Stock |
Transit
|
$8,000,000 |
FTA 5337 St of Good Repair |
NIR-24-028 |
|
NICTD |
Transit/Asset management / 2024 Rolling Stock |
Transit
|
$8,000,000 |
FTA 5337 St of Good Repair |
NIR-22-026 |
|
NICTD |
Transit/Asset management / 2022 Track Equipment |
Transit
|
$700,000 |
FTA 5337 St of Good Repair |
NIR-23-025 |
|
NICTD |
Transit/Asset management / 2023 Track Equipment |
Transit
|
$675,000 |
FTA 5337 St of Good Repair |
NIR-24-029 |
|
NICTD |
Transit/Asset management / 2024 Track Equipment |
Transit
|
$750,000 |
FTA 5337 St of Good Repair |
NIR-22-027 |
|
NICTD |
Transit/Asset management / 2022 Substation improvements |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-23-026 |
|
NICTD |
Transit/Asset management / 2023 Substation improvements |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-24-030 |
|
NICTD |
Transit/Asset management / 2024 Substation improvements |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-22-022 |
|
NICTD |
Transit/Asset management / 2022 Bidirectional signaling |
Transit
|
$3,281,693 |
FTA 5337 St of Good Repair |
NIR-23-022 |
|
NICTD |
Transit/Asset management / 2023 Bidirectional signaling |
Transit
|
$1,756,693 |
FTA 5337 St of Good Repair |
NIR-24-025 |
|
NICTD |
Transit/Asset management / 2024 Bidirectional signaling |
Transit
|
$1,940,693 |
FTA 5337 St of Good Repair |
NIR-22-021 |
|
NICTD |
Transit/Asset Management / 2022 Bridge Rehab |
Transit
|
$1,025,000 |
FTA 5337 St of Good Repair |
NIR-23-021 |
|
NICTD |
Transit/Asset Management / 2023 Bridge Rehab |
Transit
|
$2,400,000 |
FTA 5337 St of Good Repair |
NIR-24-024 |
|
NICTD |
Transit/Asset Management / 2024 Bridge Rehab |
Transit
|
$1,775,000 |
FTA 5337 St of Good Repair |
NIR-22-020 |
|
NICTD |
Transit/Asset Management / 2022 Track Improvements |
Transit
|
$2,100,000 |
FTA 5337 St of Good Repair |
NIR-23-020 |
|
NICTD |
Transit/Asset Management / 2022 Track Improvements |
Transit
|
$2,400,000 |
FTA 5337 St of Good Repair |
NIR-24-023 |
|
NICTD |
Transit/Asset Management / 2024 Track Improvements |
Transit
|
$750,000 |
FTA 5337 St of Good Repair |
NIR-23-019 |
|
NICTD |
Transit/Asset Management / 2023 Signal Catenary Upgrades |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
NIR-24-022 |
|
NICTD |
Transit/Asset Management / 2024 Signal Catenary Upgrades |
Transit
|
$1,500,000 |
FTA 5337 St of Good Repair |
NIR-24-021 |
|
NICTD |
Transit/Asset Management / 2024 PTC Routers & Servers |
Transit
|
$500,000 |
FTA 5337 St of Good Repair |
NIR-22-019 |
|
NICTD |
Transit/Asset Management / 2022 MED Improvement |
Transit
|
$5,695,500 |
FTA 5337 St of Good Repair |
NIR-24-020 |
|
NICTD |
Transit/Asset management / 2024 Maint. Equipment |
Transit
|
$260,000 |
FTA 5337 St of Good Repair |
NIR-22-025 |
|
NICTD |
Transit/Asset management / 2022 Replacement Rail |
Transit
|
$1,000,000 |
FTA 5337 St of Good Repair |
NIR-25-020 |
|
NICTD |
Rolling Stock Acquisition |
Transit
|
$16,000,000 |
FTA 5337 St of Good Repair |
NIR-25-019 |
|
NICTD |
Support vehicles |
Transit
|
$1,366,351 |
FTA 5337 St of Good Repair |
NIR-25-018 |
|
NICTD |
Track Equipment |
Transit
|
$1,680,000 |
FTA 5337 St of Good Repair |
NIR-25-022 |
|
NICTD |
Track Engineering |
Transit
|
$1,000,000 |
FTA 5337 St of Good Repair |
NIR-25-028 |
|
NICTD |
Railcar End of Life Overhaul |
Transit
|
$13,000,000 |
FTA 5337 St of Good Repair |
NIR-25-027 |
|
NICTD |
MED Improvement Project |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-25-026 |
|
NICTD |
Railcar Mid-Life Overhaul |
Transit
|
$2,000,000 |
FTA 5337 St of Good Repair |
NIR-25-021 |
|
NICTD |
West Lake Extension |
Transit
|
$29,331,056 |
Federal Special |
NIRPC1600453 |
|
NIRPC |
SSCC Green Fleets Air Quality Public Education |
Other
|
$1,800,000 |
CMAQ Chicago UZA |
2001100 |
|
NIRPC |
UPWP Planning / 2022 TIP Management Software / CMAQ Air Quality |
Other
|
$516,306 |
CMAQ Chicago UZA STBG Chicago UZA |
NIRPC2001100 |
|
NIRPC |
Planning - 2023 TIP Management Software / CMAQ Air Quality Education |
Other
|
$1,038,639 |
CMAQ Chicago UZA STBG Chicago UZA |
NIR-23-045 |
|
NIRPC |
Planning / 2023 Transit Oversight |
Transit
|
$419,000 |
FTA 5307 Chicago UZA |
NIR-23-043 |
|
NIRPC |
Transit/Operating / 2023 Operational Support Equipment |
Transit
|
$12,440 |
FTA 5307 Chicago UZA |
NIR-22-045 |
|
NIRPC |
Planning / 2022 Transit Oversight |
Transit
|
$407,000 |
FTA 5307 Chicago UZA |
NIR-24-048 |
|
NIRPC |
Transit/Operating / 2024 Operational Support Equipment |
Transit
|
$90,616 |
FTA 5307 Chicago UZA |
NIR-24-049 |
|
NIRPC |
Planning / 2024 Transit Oversight |
Transit
|
$432,000 |
FTA 5307 Chicago UZA |
NIR-22-044 |
|
NIRPC |
Transit/Operating / 2022 Operational Support Equipment |
Transit
|
$82,191 |
FTA 5307 Chicago UZA |
NIR-23-044 |
|
NIRPC |
Transit/Operating / 2023 Operational Support Equipment |
Transit
|
$83,301 |
FTA 5307 Chicago UZA |
NIRPC1600400 |
|
NIRPC |
Planning / 2024 TIP Management Software |
Transit
|
$70,344 |
STBG Chicago UZA |
NIRPC2700511 |
|
NIRPC |
NIRPC Green Fleets Program |
Other
|
$945,000 |
STBG Chicago UZA |
NIRPC2700512 |
|
NIRPC |
Road Safety Audits for Northwest Indiana |
Other
|
$310,000 |
STBG Chicago UZA |
NIR-25-032 |
|
North Township |
Operating Assistance |
Transit
|
$1,075,175 |
FTA 5307 Chicago UZA |
NIR-24-033 |
|
North Township |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$518,350 |
FTA 5307 Chicago UZA |
NIR-23-029 |
|
North Township |
Transit/Operating / 2023 Operating Assistance |
Transit
|
$518,350 |
FTA 5307 Chicago UZA |
NIR-22-030 |
|
North Township |
Transit/Operating / 2022 Operating Assistance |
Transit
|
$518,350 |
FTA 5307 Chicago UZA |
NIR-22-032 |
|
North Township |
Transit/Asset Management / 2022 Vehicle Replacement |
Transit
|
$76,400 |
FTA 5307 Chicago UZA |
NIR-24-034 |
|
North Township |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$54,000 |
FTA 5307 Chicago UZA |
NIR-25-033 |
|
North Township |
Preventative Maintenance |
Transit
|
$108,000 |
FTA 5307 Chicago UZA |
NIR-23-030 |
|
North Township |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$54,000 |
FTA 5307 Chicago UZA |
NIR-22-031 |
|
North Township |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$54,000 |
FTA 5307 Chicago UZA |
NIR-23-031 |
|
North Township |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$80,220 |
FTA 5310 Chicago UZA |
NIR-24-035 |
|
North Township |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$84,225 |
FTA 5310 Chicago UZA |
NIR-25-034 |
|
North Township |
Vehicle Replacement |
Transit
|
$173,450 |
FTA 5339 Chicago UZA |
NIR-25-035 |
|
OE |
Preventative Maintenance |
Transit
|
$260,800 |
FTA 5307 Chicago UZA |
NIR-22-033 |
|
OE |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$128,000 |
FTA 5307 Chicago UZA |
NIR-23-032 |
|
OE |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$128,000 |
FTA 5307 Chicago UZA |
NIR-24-036 |
|
OE |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$128,000 |
FTA 5307 Chicago UZA |
NIR-24-037 |
|
OE |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$202,300 |
FTA 5307 Chicago UZA |
NIR-22-034 |
|
OE |
Transit/Asset Management / 2022 Vehicle Replacement |
Transit
|
$194,500 |
FTA 5307 Chicago UZA |
NIR-23-033 |
|
OE |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$198,400 |
FTA 5310 Chicago UZA |
NIR-25-036 |
|
OE |
Vehicle Replacements |
Transit
|
$437,500 |
FTA 5310 Chicago UZA |
NIR-22-035 |
|
PCACS |
Transit/Operating / 2022 Operating Assistance |
Transit
|
$150,000 |
FTA 5307 Chicago UZA |
NIR-24-040 |
|
PCACS |
Transit/Asset Management / 2024 Preventative Maint. |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIR-23-036 |
|
PCACS |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIR-22-037 |
|
PCACS |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$50,000 |
FTA 5307 Chicago UZA |
NIR-25-037 |
|
PCACS |
Operating Assistance |
Transit
|
$575,000 |
FTA 5307 Chicago UZA |
NIR-25-039 |
|
PCACS |
Preventative Maintenance |
Transit
|
$100,000 |
FTA 5307 Chicago UZA |
NIR-23-034 |
|
PCACS |
Transit/Operating / 2023 Operating Assistance |
Transit
|
$150,000 |
FTA 5307 Chicago UZA |
NIR-23-037 |
|
PCACS |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$280,000 |
FTA 5310 Chicago UZA |
NIR-23-035 |
|
PCACS |
Transit/Expansion / 2023 Operations Expansion |
Transit
|
$50,000 |
FTA 5310 Chicago UZA |
NIR-22-038 |
|
PCACS |
Transit/Asset Management / 2022 Vehicle Replacement |
Transit
|
$140,000 |
FTA 5310 Chicago UZA |
NIR-24-041 |
|
PCACS |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$140,000 |
FTA 5310 Chicago UZA |
NIR-24-039 |
|
PCACS |
Transit/Expansion / 2024 Operations Expansion |
Transit
|
$50,000 |
FTA 5310 Chicago UZA |
NIR-25-038 |
|
PCACS |
Operating Assistance |
Transit
|
$210,000 |
FTA 5310 Chicago UZA |
NIR-24-038 |
|
PCACS |
Transit/Operating / 2024 Operating Assistance |
Transit
|
$150,000 |
FTA 5310 Chicago UZA |
NIR-22-036 |
|
PCACS |
Transit/Expansion / 2022 Operations Expansion |
Transit
|
$50,000 |
FTA 5310 Chicago UZA |
NIR-25-040 |
|
PCACS |
Vehicle Replacement |
Transit
|
$301,250 |
FTA 5339 Chicago UZA |
1902124 |
R-43165
|
Portage |
Crisman Rd Reconstruction |
Road Recons/Rehab/Resurf
|
$3,557,852 |
DEMO |
1382010 |
|
Portage |
Roadway Improvement/ Road Reconstruction (3R/4R Standards) at Samuelson Road |
Road Recons/Rehab/Resurf
|
$7,307,176 |
DEMO STBG Chicago UZA |
1173430 |
|
Portage |
Road Reconstruction (3R/4R Standards) at Central Ave |
Road Recons/Rehab/Resurf
|
$3,089,835 |
DEMO STBG Chicago UZA |
2100131 |
|
Portage |
Road Reconstruction; From County Line Rd to Willowdale & Peach to Willowcreek |
Road Recons/Rehab/Resurf
|
$973,090 |
STBG Chicago UZA |
1902001 |
R-42413
|
Porter County |
Willowcreek Rd Extension SR 130 to 700 N-FUTURE PROJECT |
Road
|
$7,340,437 |
STBG Chicago UZA |
1401029 |
R-37669
|
Porter County |
Intersec. Improvement at CR 100S |
Intersection
|
$7,761,200 |
STBG Chicago UZA STBG Group IV |
1173594 |
R-34601
|
Porter County |
Bicycle & Pedestrian Facilities |
Bike/Ped
|
$2,393,784 |
TAP Chicago UZA |
1500419 |
R-39011
|
Porter County |
Multi-use paths / Bicycle & Pedestrian Facilities |
Bike/Ped
|
$2,375,000 |
TAP Chicago UZA |
1702827 |
B-41171
|
Porter County |
Bridge Replacement |
Bridge
|
$1,266,750 |
|
1802932 |
B-42063
|
Porter County |
Bridge Replacement |
Bridge
|
$3,170,000 |
|
1802941 |
B-42061
|
Porter County |
Bridge Replacement |
Bridge
|
$1,730,000 |
|
2100109 |
|
Porter County |
Countywide Bridge Inspection |
Bridge
|
$364,770 |
|
1702821 |
B-41169
|
Porter County |
Bridge Replacement |
Bridge
|
$709,020 |
|
1702828 |
B-41172
|
Porter County |
Bridge Replacement |
Bridge
|
$2,412,729 |
|
1382603 |
R-35981
|
Schererville |
Quality of Place / Added Travel Lanes- Kennedy Ave (Phase 2) |
Road
|
$11,348,384 |
STBG Chicago UZA |
1173760 |
R-36259
|
Schererville |
Quality of Place / Added Travel Lanes at Kennedy Ave (Phase 4) |
Road
|
$6,056,754 |
STBG Chicago UZA |
1902000 |
R-42412
|
Schererville |
Roadway Expansion Kennedy Ave (Phase 3) |
Road
|
$7,760,713 |
STBG Chicago UZA |
NIR-23-016 |
|
SLCCS |
Transit/Asset Management / 2023 Vehicle Replacement |
Transit
|
$486,204 |
FTA 5307 Chicago UZA |
NIR-24-015 |
|
SLCCS |
Transit/Asset Management / 2024 Vehicle Replacement |
Transit
|
$340,340 |
FTA 5307 Chicago UZA |
NIR-22-014 |
|
SLCCS |
Transit/Asset Management / 2022 Vehicle Replacement |
Transit
|
$308,700 |
FTA 5307 Chicago UZA |
NIR-22-013 |
|
SLCCS |
Transit/Asset Management / 2022 Preventative Maint. |
Transit
|
$126,378 |
FTA 5307 Chicago UZA |
NIR-25-016 |
|
SLCCS |
Maintain Fleet of Vehicles |
Transit
|
$266,930 |
FTA 5307 Chicago UZA |
NIR-24-014 |
|
SLCCS |
Transit/Asset Management / 2021 Preventative Maint. |
Transit
|
$126,378 |
FTA 5307 Chicago UZA |
NIR-23-015 |
|
SLCCS |
Transit/Asset Management / 2023 Preventative Maint. |
Transit
|
$126,378 |
FTA 5307 Chicago UZA |
NIR-25-015 |
|
SLCCS |
Operating Assistance |
Transit
|
$951,185 |
FTA 5307 Chicago UZA |
NIR-24-016 |
|
SLCCS |
Transit/Expansion / 2024 Operations Expansion |
Transit
|
$167,600 |
FTA 5307 Chicago UZA |
NIR-23-014 |
|
SLCCS |
Transit/Expansion / 2023 Operations Expansion |
Transit
|
$25,000 |
FTA 5310 Chicago UZA |
NIR-24-013 |
|
SLCCS |
Transit/Expansion / 2024 Operations Expansion |
Transit
|
$25,000 |
FTA 5310 Chicago UZA |
NIR-22-012 |
|
SLCCS |
Transit/Expansion / 2022 Operations Expansion |
Transit
|
$25,000 |
FTA 5310 Chicago UZA |
NIR-24-011 |
|
SLCCS |
Operating/Transit / 2024 ADA Operating Assistance |
Transit
|
$250,000 |
FTA 5310 Chicago UZA |
NIR-23-012 |
|
SLCCS |
Operating/Transit / 2023 ADA Operating Assistance |
Transit
|
$250,000 |
FTA 5310 Chicago UZA |
NIR-22-010 |
|
SLCCS |
Operating/Transit / 2022 ADA Operating Assistance |
Transit
|
$250,000 |
FTA 5310 Chicago UZA |
NIR-24-012 |
|
SLCCS |
Operating/Transit / 2024 Operating Assistance |
Transit
|
$400,000 |
FTA 5310 Chicago UZA |
NIR-23-013 |
|
SLCCS |
Operating/Transit / 2023 Operating Assistance |
Transit
|
$400,000 |
FTA 5310 Chicago UZA |
NIR-22-011 |
|
SLCCS |
Operating/Transit / 2022 Operating Assistance |
Transit
|
$400,000 |
FTA 5310 Chicago UZA |
NIR-25-014 |
|
SLCCS |
Operating Assistance for Enhanced Mobility |
Transit
|
$1,001,576 |
FTA 5310 Chicago UZA |
NIRPC2700513 |
|
St. John |
Cline Ave Extension |
Road
|
$8,183,708 |
STBG Chicago UZA |
NIR-25-041 |
|
TransPorte (LaPorte) |
Operating Assistance |
Transit
|
$1,038,580 |
FTA 5307 Mich City UZA |
NIR-22-039 |
|
TransPorte (LaPorte) |
Transit / Operating Assistance / 2022 |
Transit
|
$684,664 |
FTA 5307 Mich City UZA |
NIR-23-038 |
|
TransPorte (LaPorte) |
Transit / Operating Assistance / 2023 |
Transit
|
$698,357 |
FTA 5310 Mich City UZA |
NIR-24-042 |
|
TransPorte (LaPorte) |
Transit / Operating Assistance / 2024 |
Transit
|
$712,324 |
FTA 5310 Mich City UZA |
NIR-22-040 |
|
TransPorte (LaPorte) |
Transit / Asset Management / 2022 Vehicle Replacements |
Transit
|
$287,000 |
STBG Mich City Transfer to FTA |
NIR-24-043 |
|
TransPorte (LaPorte) |
Transit / Asset Management / 2024 Vehicle Replacements |
Transit
|
$202,000 |
STBG Mich City Transfer to FTA |
NIR-25-042 |
|
TransPorte (LaPorte) |
La Porte Transporte replacement busses |
Transit
|
$220,000 |
STBG Mich City UZA |
1702151 |
R-40649
|
Valparaiso |
Landscaping at US 30 |
Other
|
$2,859,608 |
* N/A |
1902686 |
R-44059
|
Valparaiso |
Roundabout; Valparaiso- Campbell & Lincoln Ave, |
Intersection
|
$3,656,502 |
CMAQ Chicago UZA |
2101141 |
R-44008
|
Valparaiso |
Multi use trail from transit parking lot to downtown |
Bike/Ped
|
$2,570,505 |
Federal Special |
2101133 |
|
Valparaiso |
Roundabout at SR 130 & CR 400N |
Intersection
|
$285,792 |
STBG Chicago UZA |
1702150 |
R-40648
|
Valparaiso |
Landscaping at US 30 |
Other
|
$3,953,125 |
|
NIR-22-043 |
|
Valparaiso Transit |
Valparaiso Transit Transit Operations Expansion |
Transit
|
$1,582,500 |
CMAQ Chicago UZA |
NIR-24-044 |
|
Valparaiso Transit |
Transit/Operating / 2024 Cost of Contracting |
Transit
|
$650,000 |
FTA 5307 Chicago UZA |
NIR-22-041 |
|
Valparaiso Transit |
Transit/Operating / 2022 Cost of Contracting |
Transit
|
$1,716,395 |
FTA 5307 Chicago UZA |
NIR-23-040 |
|
Valparaiso Transit |
Transit/Operating / 2023 Cost of Contracting |
Transit
|
$1,716,395 |
FTA 5307 Chicago UZA |
NIR-24-045 |
|
Valparaiso Transit |
Transit/Operating / 2024 Cost of Contracting |
Transit
|
$1,716,395 |
FTA 5307 Chicago UZA |
NIR-23-041 |
|
Valparaiso Transit |
Transit/Operating / 2023 Cost of Contracting |
Transit
|
$1,486,980 |
FTA 5307 Chicago UZA |
NIR-23-039 |
|
Valparaiso Transit |
Transit/Operating / 2023 Cost of Contracting |
Transit
|
$650,000 |
FTA 5307 Chicago UZA |
NIR-22-042 |
|
Valparaiso Transit |
Transit/Operating / 2022 Cost of Contracting |
Transit
|
$1,486,980 |
FTA 5307 Chicago UZA |
NIR-25-045 |
|
Valparaiso Transit |
Capital Cost of Contracting V-Line |
Transit
|
$2,331,250 |
FTA 5307 Chicago UZA |
NIR-25-044 |
|
Valparaiso Transit |
Chicago Dash - Capital Cost of Contracting |
Transit
|
$3,766,617 |
FTA 5307 Chicago UZA |
NIR-25-043 |
|
Valparaiso Transit |
South Shore Connect Capital Cost of Contracting |
Transit
|
$380,000 |
FTA 5307 Chicago UZA |
NIR-24-046 |
|
Valparaiso Transit |
Transit/Operating / 2024 Cost of Contracting |
Transit
|
$1,486,980 |
FTA 5307 Chicago UZA |
NIR-25-046 |
|
Valparaiso Transit |
South Shore Connect Bus replacement |
Transit
|
$196,600 |
FTA 5339 Chicago UZA |
1901947 |
|
Winfield |
Sidewalks along Randolph St |
Bike/Ped
|
$537,600 |
TAP Chicago UZA |
Bookmark URL |
Amendment
|
Notes |
NIRPC Approved
|
State Approved | FHWA Approved |
[Project List]
|
20-22.45 INDOT
|
Emergency Amendment for INDOT | 4/21/2022 |
PENDING
|
PENDING
|
[Project List]
|
20-22.35 LOCAL
|
Transit amendment for January | 1/20/2022 |
4/20/2022
|
4/20/2022
|
[Project List]
|
20-22.3 LOCAL
|
January 2022 TIP Amendment | 1/20/2022 |
4/20/2022
|
4/20/2022
|
|
20-22.05 LOCAL
|
July 2022 Amendment
|
Pending |
[Project List]
|
20-22.04 LOCAL
|
March 2022 amendment | 3/17/2022 |
4/20/2022
|
4/20/2022
|
[Project List]
|
20-22.02 LOCAL
|
September 2021 Amendment (Originally approved on 9/16/2021) | 9/16/2021 |
4/20/2022
|
4/20/2022
|
[Project List]
|
20-22.01 LOCAL
|
FY 2020-2024 & 2022-2026 TIP Amendment #1 July 2021 STIP Amendment # 20-54 Originally approved on 7/15/2021 | 7/15/2021 |
4/20/2022
|
4/20/2022
|
|
20-20 ADMIN
|
April/May 2022 Admin Mod
|
Pending |
[Project List]
|
20-19.5 ADMIN
|
Last Admin Mod for 2022 | 4/27/2022 |
N/A
|
N/A
|
[Project List]
|
20-19 ADMIN
|
April 2022 Admin Mod | 4/5/2022 |
N/A
|
N/A
|
[Project List]
|
20-18 ADMIN
|
March 2022 Admin Mod | 3/9/2022 |
N/A
|
N/A
|
[Project List]
|
20-17 ADMIN
|
February 2022 Admin Mod | 2/17/2022 |
N/A
|
N/A
|
[Project List]
|
20-16 ADMIN
|
January 2022 Admin Mod | 1/13/2022 |
N/A
|
N/A
|
[Project List]
|
20-15 ADMIN
|
Admin Mod to add total costs to project missing phases. | 12/8/2021 |
N/A
|
N/A
|
[Project List]
|
20-14.3 ADMIN
|
April 2021 Admin Mod | 4/30/2021 |
N/A
|
N/A
|
[Project List]
|
20-14.2 ADMIN
|
February 2021 Admin Mod | 3/26/2021 |
N/A
|
N/A
|
[Project List]
|
20-14.1 LOCAL
|
Transit Admin Mod for June - GPTC | 6/28/2021 |
7/12/2021
|
7/14/2021
|
[Project List]
|
20-14 INDOT
|
April Infrastructure Amendment (for the 20-24 TIP) | 4/15/2021 |
Indiana05/04/2021
|
5/6/2021
|
[Project List]
|
20-12.3 ADMIN
|
Admin Mod for 0901321 | 2/7/2021 |
N/A
|
N/A
|
[Project List]
|
20-12.1 ADMIN
|
January 2021 Admin Mod | 2/12/2021 |
N/A
|
N/A
|
[Project List]
|
20-12 LOCAL
|
January 2021 Infrastructure Amendment; STIP Amend # 20-54 | 1/21/2021 |
2/5/2021
|
2/9/2021
|
[Project List]
|
20-11.3 ADMIN
|
TIP correction December 2020 | 1/21/2021 |
N/A
|
N/A
|
[Project List]
|
20-11.2 ADMIN
|
November 2020 Admin Mod | 12/18/2020 |
N/A
|
N/A
|
[Project List]
|
20-11 ADMIN
|
July Infrastructure Admin Mod | 8/28/2020 |
N/A
|
N/A
|
[Project List]
|
20-10.3 LOCAL
|
September Infrastructure Amendment | 9/17/2020 |
10/5/2020
|
10/6/2020
|
[Project List]
|
20-10.2 LOCAL
|
August FY 21 Transit Amendment | 11/2/2020 |
11/4/2020
|
11/4/2020
|
[Project List]
|
20-09.1 LOCAL
|
NIRPC Amendment #8, Emergency Amendment | 4/30/2020 |
4/30/2020
|
4/30/2020
|
[Project List]
|
20-09 LOCAL
|
July 2020 Amendment #9 | 7/16/2020 |
8/2/2020
|
8/3/2020
|
[Project List]
|
20-08.4 ADMIN
|
April/May Transit Administrative Modification | 7/3/2020 |
N/A
|
N/A
|
[Project List]
|
20-08.2 ADMIN
|
May / June Infrastructure Admin Mod | 6/25/2020 |
N/A
|
N/A
|
[Project List]
|
20-08.1 ADMIN
|
April Infrastructure Admin Mod | 4/28/2020 |
N/A
|
N/A
|
[Project List]
|
20-07.3 INDOT
|
Special discussion with JN scribner's error | 7/31/2020 |
7/31/2020
|
7/31/2020
|
[Project List]
|
20-07.2 LOCAL
|
Kennedy Ave Corridor only | 5/21/2020 |
7/31/2020
|
8/3/2020
|
[Project List]
|
20-07.1 LOCAL
|
April's Transit Amendment Only | 5/21/2020 |
7/31/2020
|
8/3/2020
|
[Project List]
|
20-07 LOCAL
|
Amendment 20-03 April 2020 | 5/21/2020 |
7/31/2020
|
8/3/2020
|
[Project List]
|
20-06.4 ADMIN
|
TRANSIT - February Admin Mod | 4/6/2020 |
N/A
|
N/A
|
[Project List]
|
20-06.3 ADMIN
|
March 2020 Infrastructure Administrative Modification | 4/6/2020 |
N/A
|
N/A
|
[Project List]
|
20-06.2 ADMIN
|
February 2020 Administrative Modification | 3/2/2020 |
N/A
|
N/A
|
[Project List]
|
20-06.1 ADMIN
|
January 2020 Administrative Modification | 1/31/2020 |
N/A
|
N/A
|
[Project List]
|
20-05.1 LOCAL
|
Emergency Amendment to include PE | 1/6/2020 |
1/9/2020
|
1/7/2020
|
[Project List]
|
20-05 LOCAL
|
January 2020 Amendment #3 | 1/31/2020 |
2/14/2020
|
2/18/2020
|
[Project List]
|
20-04.3 ADMIN
|
November 2019 Administrative Modification | 12/27/2019 |
N/A
|
N/A
|
[Project List]
|
20-04.2 ADMIN
|
October 2019 Admin Mod | 11/13/2019 |
N/A
|
N/A
|
[Project List]
|
20-04.1 ADMIN
|
August 2019 ADMIN MOD | 11/12/2019 |
N/A
|
N/A
|
[Project List]
|
20-03 INDOT
|
November 2019 Amendment #2 | 11/14/2019 |
1/7/2020
|
1/24/2020
|
[Project List]
|
20-02.3 ADMIN
|
FOR INTERNAL USE ONLY correct transit operations | 9/30/2019 |
N/A
|
N/A
|
[Project List]
|
20-02.2 ADMIN
|
Admin Mod July 2019 | 8/9/2019 |
N/A
|
N/A
|
[Project List]
|
20-02 ADMIN
|
Administrative Modification for June/July 2019 | 7/3/2019 |
N/A
|
N/A
|
[Project List]
|
20-01 INDOT
|
August 2019 Amendment to FY 2020 TIP NIRPC Amend 19-22 | 8/15/2019 |
8/16/2019
|
8/30/2019
|
[Project List]
|
20-00 ADOPTION
|
NWI 2020-2024 Transportation Improvement Program | 4/18/2019 |
8/15/2019
|
8/22/2019
|
|
|